Abyssal Modulated Deep Core Strip MinerModulated Deep Core Strip Miner II Unstable Modulated Deep Core Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
30.69GJ+7.69GJ
duration
Activation time / duration
42.55s-2.45s
cpu
CPU usage
82.1tf+22.1tf
miningCritBonusYield
Critical Success Bonus Yield
176.24%-23.76%
miningCritChance
Critical Success Chance
1.23%+0.23%
miningAmount
Mining amount
83.44m3+3.44m3
maxRange
Optimal Range
19351.5m+4351.5m
power
Powergrid Usage
10.81MW-1.19MW
miningWasteProbability
Residue Probability
37.81%+3.81%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.843x-0.157
effectiveMiningSpeed
Effective Mining Speed
2m³/s+0.19m³/s
jita analyzer
est. 155 million ISK
jita analyzer
Created byjita analyzer

AI Value prediction

These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.

Search options

Export options

Miscellaneous

Download image
Modulated Deep Core Strip Miner II
+7.69GJ-2.45s+22.1tf-23.76%+0.23%+3.44m3+4351.5m-1.19MW+3.81%-0.157+0.19m³/s5.6 million
No results.

Similar Modules Sold

Modules with the most similar attributes that have sold in the past.

Premium Feature

Unlock similar sold modules to see what comparable items have sold for in the past.

Upgrade to Premium