Abyssal Mining LaserEP-S Gaussian Scoped Mining Laser Gravid Mining Laser Mutaplasmid
capacitorNeed
Activation Cost
4.13GJ-0.87GJ
duration
Activation time / duration
15.35s+0.35s
cpu
CPU usage
73.68tf+8.68tf
miningCritBonusYield
Critical Success Bonus Yield
191.45%-8.55%
miningCritChance
Critical Success Chance
0.92%-0.08%
miningAmount
Mining amount
13.07m3+0.07m3
maxRange
Optimal Range
13995.2m-2004.8m
power
Powergrid Usage
3.15MW+0.15MW
effectiveMiningSpeed
Effective Mining Speed
0.87m³/s-0.02m³/s
Donald Barr
est. 609 thousand ISK
Donald Barr
Created byDonald Barr

AI Value prediction

These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.

Search options

Export options

Miscellaneous

Download image
EP-S Gaussian Scoped Mining Laser
-0.87GJ+0.35s+8.68tf-8.55%-0.08%+0.07m3-2004.8m+0.15MW0%0-0.02m³/s6.8 thousand
Miner I
-0.87GJ+0.35s+13.68tf-8.55%-0.08%+3.07m3+3995.2m+1.16MW0%0+0.19m³/s16 thousand
Particle Bore Compact Mining Laser
-0.87GJ+0.35s+18.68tf-8.55%-0.08%+0.07m3+2995.2m+1.16MW0%0-0.02m³/s1.1 thousand
Miner II
-13.87GJ+0.35s-6.32tf-8.55%-0.08%-1.93m3+1995.2m-0.84MW-34%-1-0.15m³/s545 thousand
'Wild' Miner I
-5.87GJ+0.35s+19.68tf-8.55%-0.08%-1.93m3+1595.2m+1.16MW0%0-0.15m³/s74 million
Gallente Mining Laser
+2.13GJ+0.35s+13.68tf-8.55%-0.08%+1.07m3+3995.2m+0.15MW-20%-1+0.05m³/s8.1 thousand
Single Diode Basic Mining Laser
+2.13GJ+0.35s+28.68tf-8.55%-0.08%+6.07m3+2995.2m+1.16MW0%0+0.39m³/s420 million
ORE Miner
-13.87GJ+0.35s-6.32tf-8.55%-0.08%-7.93m3-2004.8m-0.84MW0%0-0.56m³/s160 million
No results.

Similar Modules Sold

Modules with the most similar attributes that have sold in the past.

Premium Feature

Unlock similar sold modules to see what comparable items have sold for in the past.

Upgrade to Premium