Activation Cost
20.5GJ+5.5GJ
Activation time / duration
275.04s-24.96s
CPU usage
51.36tf-8.64tf
Critical Success Bonus Yield
205.29%+5.29%
Critical Success Chance
0.91%-0.09%
Mining amount
1122.7m3+122.7m3
Optimal Range
7764.4m-235.6m
Powergrid Usage
7.1MW+1.1MW
Residue Probability
38.04%+4.04%
Residue Volume Multiplier
1.076x+0.076
Effective Mining Speed
4.16m³/s+0.76m³/s
est. 105 million ISK
Created byKane Savage
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




