Abyssal Ice Mining LaserIce Mining Laser II Unstable Ice Mining Laser Mutaplasmid
capacitorNeed
Activation Cost
15.55GJ+0.55GJ
duration
Activation time / duration
318.36s+18.36s
cpu
CPU usage
71.06tf+11.06tf
miningCritBonusYield
Critical Success Bonus Yield
225.66%+25.66%
miningCritChance
Critical Success Chance
1.14%+0.14%
miningAmount
Mining amount
1247.35m3+247.35m3
maxRange
Optimal Range
6400.4m-1599.6m
power
Powergrid Usage
5.85MW-0.15MW
miningWasteProbability
Residue Probability
31.78%-2.22%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.965x-0.035
effectiveMiningSpeed
Effective Mining Speed
4.02m³/s+0.62m³/s
150 million ISKest. 146 million ISK
Ahraille Arnoux
Created byAhraille Arnoux

AI Value prediction

These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.

Search options

Export options

Miscellaneous

Download image
Ice Mining Laser I
+5.55GJ-41.64s+21.06tf+25.66%+0.14%+247.35m3-599.6m+0.85MW+31.78%+0.965+1.19m³/s545 thousand
Ice Mining Laser II
+0.55GJ+18.36s+11.06tf+25.66%+0.14%+247.35m3-1599.6m-0.15MW-2.22%-0.035+0.62m³/s1.4 million
ORE Ice Mining Laser
+0.55GJ+18.36s+11.06tf+25.66%+0.14%+247.35m3-4599.6m-0.15MW+31.78%+0.965+0.62m³/s64 million
233571746
Ahraille ArnouxAhraille Arnoux
2026-07-02 22:295 days ago
2026-07-30 22:29in 23 days
No
150 million

Similar Modules Sold

Modules with the most similar attributes that have sold in the past.

Premium Feature

Unlock similar sold modules to see what comparable items have sold for in the past.

Upgrade to Premium