Activation Cost
9.53GJ-5.47GJ
Activation time / duration
42.26s+2.26s
CPU usage
84.81tf+14.81tf
Mining amount
24.26m3+4.26m3
Optimal Range
1770.15m+270.15m
Powergrid Usage
6.88MW+1.88MW
Residue Probability
33.06%-0.94%
Residue Volume Multiplier
0.954x-0.046
Mining Speed
0.57m³/s+0.07m³/s
est. 61 million ISK
Created byErnaras Yaken
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




