Activation Cost
15.59GJ+0.59GJ
Activation time / duration
43.66s+3.66s
CPU usage
90.99tf+20.99tf
Mining amount
18.66m3-1.34m3
Optimal Range
1582.05m+82.05m
Powergrid Usage
7.09MW+2.09MW
Residue Probability
30.33%-3.67%
Residue Volume Multiplier
0.978x-0.022
Mining Speed
0.43m³/s-0.07m³/s
est. 10 million ISK
Created byPure Grey
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




