Activation Cost
9.61GJ-5.39GJ
Activation time / duration
42.81s+2.81s
CPU usage
101.72tf+31.72tf
Mining amount
17.25m3-2.75m3
Optimal Range
1743.75m+243.75m
Powergrid Usage
4.41MW-0.59MW
Residue Probability
28.96%-5.04%
Residue Volume Multiplier
0.857x-0.143
Mining Speed
0.4m³/s-0.1m³/s
est. 17 million ISK
Created byPure Grey
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




