Activation Cost
11.06GJ+1.06GJ
Activation time / duration
76.77s-3.23s
CPU usage
97.38tf+31.38tf
Mining amount
106.02m3+6.01m3
Optimal Range
1341.15m-158.85m
Powergrid Usage
9.21MW-0.79MW
Residue Probability
35.06%+1.06%
Residue Volume Multiplier
1.09x+0.09
Mining Speed
1.38m³/s+0.13m³/s
est. 19 million ISK
Created byErnaras Yaken
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




