Activation Cost
8.06GJ-1.94GJ
Activation time / duration
75.73s-4.27s
CPU usage
54.97tf-11.03tf
Mining amount
103.22m3+3.23m3
Optimal Range
1249.58m-250.43m
Powergrid Usage
10.09MW+0.09MW
Residue Probability
29.14%-4.86%
Residue Volume Multiplier
0.957x-0.043
Mining Speed
1.36m³/s+0.11m³/s
est. 36 million ISK
Created byPure Grey
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.



