Activation Cost
7.2GJ-2.8GJ
Activation time / duration
76.19s-3.81s
CPU usage
87.96tf+21.96tf
Mining amount
101.65m3+1.65m3
Optimal Range
1855.95m+355.95m
Powergrid Usage
12.45MW+2.44MW
Residue Probability
40.98%+6.98%
Residue Volume Multiplier
1.053x+0.053
Mining Speed
1.33m³/s+0.08m³/s
est. 19 million ISK
Created byPure Grey
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.



