Activation Cost
8.78GJ-1.22GJ
Activation time / duration
84.29s+4.29s
CPU usage
59.04tf-6.96tf
Mining amount
95.22m3-4.79m3
Optimal Range
1827.08m+327.07m
Powergrid Usage
12.65MW+2.65MW
Residue Probability
33.23%-0.78%
Residue Volume Multiplier
0.818x-0.182
Mining Speed
1.13m³/s-0.12m³/s
est. 21 million ISK
Created byPure Grey
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.



