Activation Cost
10.85GJ+0.84GJ
Activation time / duration
81.22s+1.22s
CPU usage
73.09tf+7.09tf
Mining amount
109.27m3+9.27m3
Optimal Range
1491.3m-8.7m
Powergrid Usage
9.52MW-0.48MW
Residue Probability
32.58%-1.42%
Residue Volume Multiplier
1.055x+0.055
Mining Speed
1.34m³/s+0.1m³/s
est. 13 million ISK
Created byErnaras Yaken
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.



