Activation Cost
9.91GJ-0.09GJ
Activation time / duration
83.6s+3.6s
CPU usage
77.69tf+11.69tf
Mining amount
109.61m3+9.61m3
Optimal Range
1482.9m-17.1m
Powergrid Usage
10.58MW+0.58MW
Residue Probability
34.2%+0.2%
Residue Volume Multiplier
0.976x-0.024
Mining Speed
1.31m³/s+0.06m³/s
est. 10 million ISK
Created byErnaras Yaken
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.



