Activation Cost
24.01GJ+1.01GJ
Activation time / duration
48.5s+3.5s
CPU usage
69.55tf+9.55tf
Critical Success Bonus Yield
207.39%+7.39%
Critical Success Chance
1.09%+0.09%
Mining amount
100.9m3+20.9m3
Optimal Range
18881.25m+3881.25m
Powergrid Usage
16.54MW+4.54MW
Residue Probability
28.64%-5.37%
Residue Volume Multiplier
1.138x+0.138
Effective Mining Speed
2.13m³/s+0.31m³/s
50 million ISKest. 84 million ISK
Created bytrudyaga gas
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
232227508 | 2026-05-29 00:0015 hours ago | 2026-06-01 14:38in 3 days | No | 50 million |
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




