Activation Cost
24.64GJ+1.64GJ
Activation time / duration
43.55s-1.45s
CPU usage
62.57tf+2.57tf
Critical Success Bonus Yield
161.82%-38.18%
Critical Success Chance
0.99%-0.01%
Mining amount
83.3m3+3.3m3
Optimal Range
12264.75m-2735.25m
Powergrid Usage
13.25MW+1.25MW
Residue Probability
27.33%-6.67%
Residue Volume Multiplier
0.928x-0.072
Effective Mining Speed
1.94m³/s+0.13m³/s
100 million ISKest. 30 million ISK
Created bytrudyaga gas
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
232226724 | 2026-05-29 00:0015 hours ago | 2026-06-01 14:08in 3 days | No | 100 million |
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




