Abyssal Mining LaserEP-S Gaussian Scoped Mining Laser Gravid Mining Laser Mutaplasmid
capacitorNeed
Activation Cost
4.56GJ-0.44GJ
duration
Activation time / duration
14.6s-0.4s
cpu
CPU usage
76.66tf+11.66tf
miningCritBonusYield
Critical Success Bonus Yield
173%-27%
miningCritChance
Critical Success Chance
1.17%+0.17%
miningAmount
Mining amount
15.51m3+2.51m3
maxRange
Optimal Range
14542.4m-1457.6m
power
Powergrid Usage
3.45MW+0.45MW
effectiveMiningSpeed
Effective Mining Speed
1.08m³/s+0.2m³/s
Ernst Salomon
est. 19 million ISK
Ernst Salomon
Created byErnst Salomon

AI Value prediction

These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.

Search options

Export options

Miscellaneous

Download image
EP-S Gaussian Scoped Mining Laser
-0.44GJ-0.4s+11.66tf-27%+0.17%+2.51m3-1457.6m+0.45MW0%0+0.2m³/s17 thousand
Miner I
-0.44GJ-0.4s+16.66tf-27%+0.17%+5.51m3+4542.4m+1.45MW0%0+0.4m³/s20 thousand
Particle Bore Compact Mining Laser
-0.44GJ-0.4s+21.66tf-27%+0.17%+2.51m3+3542.4m+1.45MW0%0+0.2m³/s1.1 thousand
Miner II
-13.44GJ-0.4s-3.34tf-27%+0.17%+0.51m3+2542.4m-0.55MW-34%-1+0.06m³/s636 thousand
'Wild' Miner I
-5.44GJ-0.4s+22.66tf-27%+0.17%+0.51m3+2142.4m+1.45MW0%0+0.06m³/s73 million
Gallente Mining Laser
+2.56GJ-0.4s+16.66tf-27%+0.17%+3.51m3+4542.4m+0.45MW-20%-1+0.27m³/s35 thousand
Single Diode Basic Mining Laser
+2.56GJ-0.4s+31.66tf-27%+0.17%+8.51m3+3542.4m+1.45MW0%0+0.61m³/s420 million
ORE Miner
-13.44GJ-0.4s-3.34tf-27%+0.17%-5.49m3-1457.6m-0.55MW0%0-0.34m³/s176 million
No results.

Similar Modules Sold

Modules with the most similar attributes that have sold in the past.

Premium Feature

Unlock similar sold modules to see what comparable items have sold for in the past.

Upgrade to Premium