Coon Man

Capsuleer

Modules for sale
159
Modules created
376
Total value
3.9 billion ISK

Category

Meta Group

Meta Level

Est. value

ISK 1M
ISK 100B
1M
10M
100M
1B
10B
100B
Sort
Display:
Attribute Bars:
Page 1
Medium Abyssal Energy Neutralizer Medium Energy Neutralizer II Decayed Medium Energy Neutralizer Mutaplasmid
capacitorNeed
Activation Cost
129.34GJ -20.66GJ
cpu
CPU usage
19.31tf -0.69tf
energyNeutralizerAmount
Neutralization Amount
175.75GJ -4.25GJ
maxRange
Optimal Range
10880m +880m
power
Powergrid Usage
210.28MW +10.28MW
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
36.63GJ +6.63GJ
duration
Activation time / duration
45.32s +0.32s
cpu
CPU usage
51.41tf -8.6tf
miningCritBonusYield
Critical Success Bonus Yield
176.4% -23.6%
miningCritChance
Critical Success Chance
1.19% +0.19%
miningAmount
Mining amount
108.07m3 -11.93m3
maxRange
Optimal Range
12675m -2325m
power
Powergrid Usage
11.98MW -0.02MW
miningWasteProbability
Residue Probability
28.17% -5.83%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.877x -0.123
effectiveMiningSpeed
Effective Mining Speed
2.44m³/s -0.28m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
37.63GJ +7.63GJ
duration
Activation time / duration
43.81s -1.19s
cpu
CPU usage
72.92tf +12.92tf
miningCritBonusYield
Critical Success Bonus Yield
192.95% -7.05%
miningCritChance
Critical Success Chance
1.05% +0.05%
miningAmount
Mining amount
110.56m3 -9.44m3
maxRange
Optimal Range
12283.5m -2716.5m
power
Powergrid Usage
14.02MW +2.02MW
miningWasteProbability
Residue Probability
31.76% -2.24%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.945x -0.055
effectiveMiningSpeed
Effective Mining Speed
2.58m³/s -0.14m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.69GJ -2.31GJ
duration
Activation time / duration
44.75s -0.25s
cpu
CPU usage
69.93tf +9.93tf
miningCritBonusYield
Critical Success Bonus Yield
177.15% -22.85%
miningCritChance
Critical Success Chance
0.85% -0.15%
miningAmount
Mining amount
111.42m3 -8.58m3
maxRange
Optimal Range
18189.75m +3189.75m
power
Powergrid Usage
14.28MW +2.28MW
miningWasteProbability
Residue Probability
34.72% +0.72%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.097x +0.097
effectiveMiningSpeed
Effective Mining Speed
2.53m³/s -0.19m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
28.16GJ -1.84GJ
duration
Activation time / duration
48.01s +3.01s
cpu
CPU usage
65.58tf +5.58tf
miningCritBonusYield
Critical Success Bonus Yield
181.4% -18.6%
miningCritChance
Critical Success Chance
0.97% -0.03%
miningAmount
Mining amount
110.45m3 -9.55m3
maxRange
Optimal Range
14511m -489m
power
Powergrid Usage
11.09MW -0.91MW
miningWasteProbability
Residue Probability
29.95% -4.05%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.95x -0.05
effectiveMiningSpeed
Effective Mining Speed
2.34m³/s -0.38m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
33.85GJ +3.85GJ
duration
Activation time / duration
47.27s +2.27s
cpu
CPU usage
77.54tf +17.54tf
miningCritBonusYield
Critical Success Bonus Yield
180.6% -19.4%
miningCritChance
Critical Success Chance
1.14% +0.14%
miningAmount
Mining amount
133.63m3 +13.63m3
maxRange
Optimal Range
12222.75m -2777.25m
power
Powergrid Usage
13.57MW +1.57MW
miningWasteProbability
Residue Probability
29.14% -4.86%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.079x +0.079
effectiveMiningSpeed
Effective Mining Speed
2.88m³/s +0.17m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
38.15GJ +8.14GJ
duration
Activation time / duration
45.01s +0.01s
cpu
CPU usage
67.88tf +7.88tf
miningCritBonusYield
Critical Success Bonus Yield
175.4% -24.6%
miningCritChance
Critical Success Chance
0.76% -0.24%
miningAmount
Mining amount
123.19m3 +3.19m3
maxRange
Optimal Range
12384.75m -2615.25m
power
Powergrid Usage
13.55MW +1.55MW
miningWasteProbability
Residue Probability
29.19% -4.81%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.961x -0.039
effectiveMiningSpeed
Effective Mining Speed
2.77m³/s +0.05m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.6GJ -5.4GJ
duration
Activation time / duration
46.45s +1.45s
cpu
CPU usage
53.46tf -6.54tf
miningCritBonusYield
Critical Success Bonus Yield
200.45% +0.45%
miningCritChance
Critical Success Chance
0.86% -0.14%
miningAmount
Mining amount
116.1m3 -3.9m3
maxRange
Optimal Range
17312.25m +2312.25m
power
Powergrid Usage
15.17MW +3.17MW
miningWasteProbability
Residue Probability
35.74% +1.74%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.967x -0.033
effectiveMiningSpeed
Effective Mining Speed
2.54m³/s -0.18m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24GJ -6GJ
duration
Activation time / duration
47.71s +2.71s
cpu
CPU usage
76.62tf +16.62tf
miningCritBonusYield
Critical Success Bonus Yield
199.4% -0.6%
miningCritChance
Critical Success Chance
0.85% -0.15%
miningAmount
Mining amount
118.51m3 -1.49m3
maxRange
Optimal Range
12344.25m -2655.75m
power
Powergrid Usage
11.88MW -0.12MW
miningWasteProbability
Residue Probability
33.66% -0.34%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.964x -0.036
effectiveMiningSpeed
Effective Mining Speed
2.53m³/s -0.19m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
33.08GJ +3.08GJ
duration
Activation time / duration
45.88s +0.88s
cpu
CPU usage
58.45tf -1.55tf
miningCritBonusYield
Critical Success Bonus Yield
210.25% +10.25%
miningCritChance
Critical Success Chance
1.05% +0.05%
miningAmount
Mining amount
113m3 -7m3
maxRange
Optimal Range
18169.5m +3169.5m
power
Powergrid Usage
10.38MW -1.62MW
miningWasteProbability
Residue Probability
36.11% +2.11%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.922x -0.078
effectiveMiningSpeed
Effective Mining Speed
2.52m³/s -0.2m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
38.77GJ +8.78GJ
duration
Activation time / duration
46.28s +1.28s
cpu
CPU usage
55.81tf -4.19tf
miningCritBonusYield
Critical Success Bonus Yield
216.3% +16.3%
miningCritChance
Critical Success Chance
1.16% +0.15%
miningAmount
Mining amount
109.62m3 -10.38m3
maxRange
Optimal Range
14821.5m -178.5m
power
Powergrid Usage
14.41MW +2.41MW
miningWasteProbability
Residue Probability
32.98% -1.02%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.912x -0.088
effectiveMiningSpeed
Effective Mining Speed
2.43m³/s -0.29m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.91GJ +5.91GJ
duration
Activation time / duration
45.37s +0.37s
cpu
CPU usage
63.53tf +3.53tf
miningCritBonusYield
Critical Success Bonus Yield
178.4% -21.6%
miningCritChance
Critical Success Chance
0.96% -0.04%
miningAmount
Mining amount
109.76m3 -10.24m3
maxRange
Optimal Range
14133m -867m
power
Powergrid Usage
14.42MW +2.42MW
miningWasteProbability
Residue Probability
36.81% +2.81%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.99x -0.01
effectiveMiningSpeed
Effective Mining Speed
2.46m³/s -0.26m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
29.82GJ -0.18GJ
duration
Activation time / duration
46.49s +1.49s
cpu
CPU usage
63.42tf +3.42tf
miningCritBonusYield
Critical Success Bonus Yield
183.7% -16.3%
miningCritChance
Critical Success Chance
0.88% -0.12%
miningAmount
Mining amount
125.6m3 +5.6m3
maxRange
Optimal Range
17953.5m +2953.5m
power
Powergrid Usage
10.66MW -1.34MW
miningWasteProbability
Residue Probability
36.95% +2.95%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.07x +0.07
effectiveMiningSpeed
Effective Mining Speed
2.75m³/s +0.03m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
29.25GJ -0.75GJ
duration
Activation time / duration
44.26s -0.74s
cpu
CPU usage
64.42tf +4.42tf
miningCritBonusYield
Critical Success Bonus Yield
217.45% +17.45%
miningCritChance
Critical Success Chance
0.99% -0.01%
miningAmount
Mining amount
110.7m3 -9.3m3
maxRange
Optimal Range
16293m +1293m
power
Powergrid Usage
15.54MW +3.54MW
miningWasteProbability
Residue Probability
34.14% +0.14%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.972x -0.028
effectiveMiningSpeed
Effective Mining Speed
2.56m³/s -0.17m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.23GJ +1.23GJ
duration
Activation time / duration
46.21s +1.21s
cpu
CPU usage
73.73tf +13.73tf
miningCritBonusYield
Critical Success Bonus Yield
210.35% +10.35%
miningCritChance
Critical Success Chance
1.01% +0.01%
miningAmount
Mining amount
111.53m3 -8.47m3
maxRange
Optimal Range
17190.75m +2190.75m
power
Powergrid Usage
11.39MW -0.61MW
miningWasteProbability
Residue Probability
34.65% +0.65%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.857x -0.143
effectiveMiningSpeed
Effective Mining Speed
2.46m³/s -0.26m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
37.7GJ +7.7GJ
duration
Activation time / duration
44.12s -0.88s
cpu
CPU usage
69.28tf +9.28tf
miningCritBonusYield
Critical Success Bonus Yield
204.4% +4.4%
miningCritChance
Critical Success Chance
1.17% +0.17%
miningAmount
Mining amount
113.87m3 -6.13m3
maxRange
Optimal Range
15564m +564m
power
Powergrid Usage
10.55MW -1.45MW
miningWasteProbability
Residue Probability
34.46% +0.46%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.077x +0.077
effectiveMiningSpeed
Effective Mining Speed
2.64m³/s -0.08m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.48GJ +5.47GJ
duration
Activation time / duration
46.64s +1.64s
cpu
CPU usage
63.47tf +3.47tf
miningCritBonusYield
Critical Success Bonus Yield
179.2% -20.8%
miningCritChance
Critical Success Chance
0.92% -0.08%
miningAmount
Mining amount
121.43m3 +1.43m3
maxRange
Optimal Range
18412.5m +3412.5m
power
Powergrid Usage
14.79MW +2.79MW
miningWasteProbability
Residue Probability
33.67% -0.33%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.862x -0.138
effectiveMiningSpeed
Effective Mining Speed
2.65m³/s -0.07m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.77GJ -5.24GJ
duration
Activation time / duration
46.69s +1.69s
cpu
CPU usage
51.38tf -8.62tf
miningCritBonusYield
Critical Success Bonus Yield
218.15% +18.15%
miningCritChance
Critical Success Chance
1.04% +0.04%
miningAmount
Mining amount
113.72m3 -6.28m3
maxRange
Optimal Range
12128.25m -2871.75m
power
Powergrid Usage
11.26MW -0.74MW
miningWasteProbability
Residue Probability
35.2% +1.2%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.082x +0.082
effectiveMiningSpeed
Effective Mining Speed
2.49m³/s -0.23m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.58GJ +4.58GJ
duration
Activation time / duration
45.05s +0.04s
cpu
CPU usage
74.79tf +14.79tf
miningCritBonusYield
Critical Success Bonus Yield
181.1% -18.9%
miningCritChance
Critical Success Chance
1.02% +0.02%
miningAmount
Mining amount
118.44m3 -1.56m3
maxRange
Optimal Range
12378m -2622m
power
Powergrid Usage
14.06MW +2.06MW
miningWasteProbability
Residue Probability
38.35% +4.35%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.077x +0.077
effectiveMiningSpeed
Effective Mining Speed
2.68m³/s -0.04m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
30GJ 0GJ
duration
Activation time / duration
47.59s +2.59s
cpu
CPU usage
58.59tf -1.41tf
miningCritBonusYield
Critical Success Bonus Yield
176.6% -23.4%
miningCritChance
Critical Success Chance
1.04% +0.04%
miningAmount
Mining amount
127.66m3 +7.66m3
maxRange
Optimal Range
12364.5m -2635.5m
power
Powergrid Usage
14.36MW +2.36MW
miningWasteProbability
Residue Probability
40.72% +6.72%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.988x -0.012
effectiveMiningSpeed
Effective Mining Speed
2.73m³/s +0.01m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.9GJ +5.89GJ
duration
Activation time / duration
48.13s +3.13s
cpu
CPU usage
54.32tf -5.68tf
miningCritBonusYield
Critical Success Bonus Yield
176.6% -23.4%
miningCritChance
Critical Success Chance
0.84% -0.16%
miningAmount
Mining amount
134.68m3 +14.68m3
maxRange
Optimal Range
15996m +996m
power
Powergrid Usage
12.45MW +0.45MW
miningWasteProbability
Residue Probability
27.95% -6.05%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.956x -0.044
effectiveMiningSpeed
Effective Mining Speed
2.84m³/s +0.12m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.39GJ -3.62GJ
duration
Activation time / duration
47.05s +2.05s
cpu
CPU usage
77.51tf +17.51tf
miningCritBonusYield
Critical Success Bonus Yield
182.15% -17.85%
miningCritChance
Critical Success Chance
0.76% -0.24%
miningAmount
Mining amount
113m3 -7m3
maxRange
Optimal Range
12587.25m -2412.75m
power
Powergrid Usage
11.87MW -0.13MW
miningWasteProbability
Residue Probability
28.72% -5.28%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.952x -0.048
effectiveMiningSpeed
Effective Mining Speed
2.44m³/s -0.28m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.8GJ -2.21GJ
duration
Activation time / duration
45.48s +0.48s
cpu
CPU usage
61.37tf +1.37tf
miningCritBonusYield
Critical Success Bonus Yield
194% -6%
miningCritChance
Critical Success Chance
1.19% +0.19%
miningAmount
Mining amount
117m3 -3m3
maxRange
Optimal Range
14349m -651m
power
Powergrid Usage
15.1MW +3.1MW
miningWasteProbability
Residue Probability
32.94% -1.06%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.092x +0.092
effectiveMiningSpeed
Effective Mining Speed
2.63m³/s -0.09m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.96GJ -2.04GJ
duration
Activation time / duration
47.69s +2.69s
cpu
CPU usage
73.84tf +13.84tf
miningCritBonusYield
Critical Success Bonus Yield
199.95% -0.05%
miningCritChance
Critical Success Chance
0.86% -0.14%
miningAmount
Mining amount
111.49m3 -8.51m3
maxRange
Optimal Range
12938.25m -2061.75m
power
Powergrid Usage
11.36MW -0.64MW
miningWasteProbability
Residue Probability
38.23% +4.23%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.943x -0.057
effectiveMiningSpeed
Effective Mining Speed
2.38m³/s -0.34m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.27GJ -3.73GJ
duration
Activation time / duration
45.46s +0.46s
cpu
CPU usage
67.82tf +7.82tf
miningCritBonusYield
Critical Success Bonus Yield
175.75% -24.25%
miningCritChance
Critical Success Chance
0.84% -0.16%
miningAmount
Mining amount
129.35m3 +9.35m3
maxRange
Optimal Range
18351.75m +3351.75m
power
Powergrid Usage
13.79MW +1.79MW
miningWasteProbability
Residue Probability
35.75% +1.75%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.044x +0.044
effectiveMiningSpeed
Effective Mining Speed
2.89m³/s +0.17m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
33.66GJ +3.66GJ
duration
Activation time / duration
44.56s -0.44s
cpu
CPU usage
69.52tf +9.52tf
miningCritBonusYield
Critical Success Bonus Yield
192% -8%
miningCritChance
Critical Success Chance
0.96% -0.04%
miningAmount
Mining amount
115.38m3 -4.62m3
maxRange
Optimal Range
18351.75m +3351.75m
power
Powergrid Usage
14.48MW +2.48MW
miningWasteProbability
Residue Probability
32.49% -1.51%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.098x +0.098
effectiveMiningSpeed
Effective Mining Speed
2.64m³/s -0.08m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.51GJ -5.49GJ
duration
Activation time / duration
45.73s +0.73s
cpu
CPU usage
60.05tf +0.04tf
miningCritBonusYield
Critical Success Bonus Yield
202% +2%
miningCritChance
Critical Success Chance
0.76% -0.24%
miningAmount
Mining amount
119.63m3 -0.37m3
maxRange
Optimal Range
15469.5m +469.5m
power
Powergrid Usage
12.59MW +0.59MW
miningWasteProbability
Residue Probability
27.92% -6.08%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.962x -0.038
effectiveMiningSpeed
Effective Mining Speed
2.66m³/s -0.06m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
38.02GJ +8.03GJ
duration
Activation time / duration
45.91s +0.91s
cpu
CPU usage
68.25tf +8.25tf
miningCritBonusYield
Critical Success Bonus Yield
180% -20%
miningCritChance
Critical Success Chance
1.2% +0.2%
miningAmount
Mining amount
117.43m3 -2.57m3
maxRange
Optimal Range
13707.75m -1292.25m
power
Powergrid Usage
10.84MW -1.16MW
miningWasteProbability
Residue Probability
39.83% +5.83%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.959x -0.041
effectiveMiningSpeed
Effective Mining Speed
2.61m³/s -0.11m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
32.2GJ +2.21GJ
duration
Activation time / duration
45.26s +0.26s
cpu
CPU usage
74.33tf +14.33tf
miningCritBonusYield
Critical Success Bonus Yield
177.05% -22.95%
miningCritChance
Critical Success Chance
1.1% +0.1%
miningAmount
Mining amount
120.92m3 +0.92m3
maxRange
Optimal Range
15388.5m +388.5m
power
Powergrid Usage
11.81MW -0.19MW
miningWasteProbability
Residue Probability
36.18% +2.18%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.095x +0.095
effectiveMiningSpeed
Effective Mining Speed
2.72m³/s +0m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
30.43GJ +0.43GJ
duration
Activation time / duration
42.89s -2.11s
cpu
CPU usage
63.61tf +3.61tf
miningCritBonusYield
Critical Success Bonus Yield
189.85% -10.15%
miningCritChance
Critical Success Chance
1.07% +0.07%
miningAmount
Mining amount
109.73m3 -10.27m3
maxRange
Optimal Range
15395.25m +395.25m
power
Powergrid Usage
10.85MW -1.15MW
miningWasteProbability
Residue Probability
38% +4%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.09x +0.09
effectiveMiningSpeed
Effective Mining Speed
2.61m³/s -0.11m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
28.5GJ -1.5GJ
duration
Activation time / duration
46.84s +1.84s
cpu
CPU usage
52.59tf -7.41tf
miningCritBonusYield
Critical Success Bonus Yield
213.1% +13.1%
miningCritChance
Critical Success Chance
0.89% -0.11%
miningAmount
Mining amount
121.32m3 +1.32m3
maxRange
Optimal Range
14072.25m -927.75m
power
Powergrid Usage
15.22MW +3.22MW
miningWasteProbability
Residue Probability
29.61% -4.39%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.921x -0.079
effectiveMiningSpeed
Effective Mining Speed
2.64m³/s -0.08m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.48GJ +5.47GJ
duration
Activation time / duration
45.59s +0.58s
cpu
CPU usage
67.69tf +7.69tf
miningCritBonusYield
Critical Success Bonus Yield
192.3% -7.7%
miningCritChance
Critical Success Chance
0.98% -0.02%
miningAmount
Mining amount
132.66m3 +12.66m3
maxRange
Optimal Range
13478.25m -1521.75m
power
Powergrid Usage
10.56MW -1.44MW
miningWasteProbability
Residue Probability
31.13% -2.87%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.087x +0.087
effectiveMiningSpeed
Effective Mining Speed
2.96m³/s +0.24m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.41GJ -2.6GJ
duration
Activation time / duration
45.4s +0.4s
cpu
CPU usage
53.11tf -6.89tf
miningCritBonusYield
Critical Success Bonus Yield
193.3% -6.7%
miningCritChance
Critical Success Chance
0.92% -0.08%
miningAmount
Mining amount
112m3 -8m3
maxRange
Optimal Range
18034.5m +3034.5m
power
Powergrid Usage
10.31MW -1.69MW
miningWasteProbability
Residue Probability
33.96% -0.04%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.95x -0.05
effectiveMiningSpeed
Effective Mining Speed
2.51m³/s -0.21m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
25.36GJ -4.63GJ
duration
Activation time / duration
44.23s -0.77s
cpu
CPU usage
73.28tf +13.28tf
miningCritBonusYield
Critical Success Bonus Yield
187.8% -12.2%
miningCritChance
Critical Success Chance
0.91% -0.09%
miningAmount
Mining amount
110.23m3 -9.77m3
maxRange
Optimal Range
17697m +2697m
power
Powergrid Usage
11.52MW -0.48MW
miningWasteProbability
Residue Probability
27.58% -6.42%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.909x -0.091
effectiveMiningSpeed
Effective Mining Speed
2.54m³/s -0.18m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.84GJ -5.16GJ
duration
Activation time / duration
48.35s +3.35s
cpu
CPU usage
67.2tf +7.2tf
miningCritBonusYield
Critical Success Bonus Yield
199.45% -0.55%
miningCritChance
Critical Success Chance
1.09% +0.09%
miningAmount
Mining amount
123.01m3 +3.01m3
maxRange
Optimal Range
17339.25m +2339.25m
power
Powergrid Usage
14.64MW +2.64MW
miningWasteProbability
Residue Probability
33.14% -0.86%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.91x -0.09
effectiveMiningSpeed
Effective Mining Speed
2.6m³/s -0.12m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
33.75GJ +3.75GJ
duration
Activation time / duration
43.06s -1.94s
cpu
CPU usage
68.44tf +8.44tf
miningCritBonusYield
Critical Success Bonus Yield
188.85% -11.15%
miningCritChance
Critical Success Chance
0.95% -0.05%
miningAmount
Mining amount
123.98m3 +3.98m3
maxRange
Optimal Range
13464.75m -1535.25m
power
Powergrid Usage
15.4MW +3.4MW
miningWasteProbability
Residue Probability
38.8% +4.8%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.029x +0.029
effectiveMiningSpeed
Effective Mining Speed
2.93m³/s +0.21m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
30.32GJ +0.32GJ
duration
Activation time / duration
48.25s +3.25s
cpu
CPU usage
62.56tf +2.56tf
miningCritBonusYield
Critical Success Bonus Yield
188.8% -11.2%
miningCritChance
Critical Success Chance
0.94% -0.06%
miningAmount
Mining amount
131.87m3 +11.87m3
maxRange
Optimal Range
18223.5m +3223.5m
power
Powergrid Usage
10.64MW -1.36MW
miningWasteProbability
Residue Probability
40.55% +6.55%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.861x -0.139
effectiveMiningSpeed
Effective Mining Speed
2.78m³/s +0.06m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
30.29GJ +0.28GJ
duration
Activation time / duration
45.42s +0.42s
cpu
CPU usage
66.12tf +6.12tf
miningCritBonusYield
Critical Success Bonus Yield
176.7% -23.3%
miningCritChance
Critical Success Chance
0.79% -0.21%
miningAmount
Mining amount
117.22m3 -2.78m3
maxRange
Optimal Range
17946.75m +2946.75m
power
Powergrid Usage
10.29MW -1.71MW
miningWasteProbability
Residue Probability
36.33% +2.33%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.034x +0.034
effectiveMiningSpeed
Effective Mining Speed
2.62m³/s -0.1m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.35GJ +5.36GJ
duration
Activation time / duration
47.58s +2.58s
cpu
CPU usage
62.88tf +2.88tf
miningCritBonusYield
Critical Success Bonus Yield
196.6% -3.4%
miningCritChance
Critical Success Chance
0.88% -0.12%
miningAmount
Mining amount
117.83m3 -2.17m3
maxRange
Optimal Range
15132m +132m
power
Powergrid Usage
13.74MW +1.74MW
miningWasteProbability
Residue Probability
31.43% -2.57%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.014x +0.014
effectiveMiningSpeed
Effective Mining Speed
2.52m³/s -0.2m³/s
Coon Man
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.84GJ +1.84GJ
duration
Activation time / duration
47.77s +2.77s
cpu
CPU usage
53.3tf -6.71tf
miningCritBonusYield
Critical Success Bonus Yield
182.55% -17.45%
miningCritChance
Critical Success Chance
0.97% -0.03%
miningAmount
Mining amount
114.05m3 -5.95m3
maxRange
Optimal Range
16360.5m +1360.5m
power
Powergrid Usage
11.1MW -0.9MW
miningWasteProbability
Residue Probability
28% -6%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.072x +0.072
effectiveMiningSpeed
Effective Mining Speed
2.43m³/s -0.29m³/s
Coon Man
Display:
Attribute Bars:
Page 1