Abyssal Modulated Strip MinerModulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
22.87GJ-7.13GJ
duration
Activation time / duration
43.79s-1.21s
cpu
CPU usage
79.29tf+19.29tf
miningCritBonusYield
Critical Success Bonus Yield
168.75%-31.25%
miningCritChance
Critical Success Chance
1.16%+0.16%
miningAmount
Mining amount
122.41m3+2.41m3
maxRange
Optimal Range
18914.25m+3914.25m
power
Powergrid Usage
14.88MW+2.88MW
miningWasteProbability
Residue Probability
25.11%-8.89%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.848x-0.152
effectiveMiningSpeed
Effective Mining Speed
2.85m³/s+0.13m³/s
Tarmarge Crehtaht
est. 96 million ISK

AI value prediction

Evaluated 5 days ago

ConfidenceModerateR² 0.52
Bias scoreVery low1,817 samples
Avg. error (MAE)±73Mthe lower, the better
Last trained1 day ago
Training data
Tech II1,817
View historic sales
Modulated Strip Miner II
5
-7.13GJ
-1.21s
+19.29tf
-31.25%
+0.16%
+2.41m3
+3914.25m
+2.88MW
-8.89%
-0.152
+0.13m³/s
5M