Abyssal Mining LaserMiner II Gravid Mining Laser Mutaplasmid
capacitorNeed
Activation Cost
16.22GJ-1.78GJ
duration
Activation time / duration
15.35s+0.35s
cpu
CPU usage
71.13tf-8.87tf
miningCritBonusYield
Critical Success Bonus Yield
205.55%+5.55%
miningCritChance
Critical Success Chance
0.99%-0.01%
miningAmount
Mining amount
14.49m3-0.51m3
maxRange
Optimal Range
11441.4m-558.6m
power
Powergrid Usage
4.25MW+0.25MW
miningWasteProbability
Residue Probability
31.4%-2.6%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.993x-0.007
effectiveMiningSpeed
Effective Mining Speed
0.96m³/s-0.06m³/s
Wewq21
est. 4.6 million ISK
Wewq21
Created byWewq21

AI Value prediction

These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.

Search options

Export options

Miscellaneous

Download image
EP-S Gaussian Scoped Mining Laser
+11.22GJ+0.35s+6.13tf+5.55%-0.01%+1.49m3-4558.6m+1.25MW+31.4%+0.993+0.08m³/s10 thousand
Miner I
+11.22GJ+0.35s+11.13tf+5.55%-0.01%+4.49m3+1441.4m+2.25MW+31.4%+0.993+0.28m³/s13 thousand
Particle Bore Compact Mining Laser
+11.22GJ+0.35s+16.13tf+5.55%-0.01%+1.49m3+441.4m+2.25MW+31.4%+0.993+0.08m³/s1.6 thousand
Miner II
-1.78GJ+0.35s-8.87tf+5.55%-0.01%-0.51m3-558.6m+0.25MW-2.6%-0.007-0.06m³/s579 thousand
'Wild' Miner I
+6.22GJ+0.35s+17.13tf+5.55%-0.01%-0.51m3-958.6m+2.25MW+31.4%+0.993-0.06m³/s74 million
Gallente Mining Laser
+14.22GJ+0.35s+11.13tf+5.55%-0.01%+2.49m3+1441.4m+1.25MW+11.4%-0.007+0.15m³/s15 thousand
Single Diode Basic Mining Laser
+14.22GJ+0.35s+26.13tf+5.55%-0.01%+7.49m3+441.4m+2.25MW+31.4%+0.993+0.49m³/s420 million
ORE Miner
-1.78GJ+0.35s-8.87tf+5.55%-0.01%-6.51m3-4558.6m+0.25MW+31.4%+0.993-0.47m³/s196 million
No results.

Similar Modules Sold

Modules with the most similar attributes that have sold in the past.

Premium Feature

Unlock similar sold modules to see what comparable items have sold for in the past.

Upgrade to Premium