Activation Cost
17.3GJ+2.3GJ
Activation time / duration
271.38s-28.62s
CPU usage
66.52tf+6.52tf
Critical Success Bonus Yield
190.1%-9.9%
Critical Success Chance
0.87%-0.13%
Mining amount
854.95m3-145.05m3
Optimal Range
6246.4m-1753.6m
Powergrid Usage
5.25MW-0.75MW
Residue Probability
35.59%+1.59%
Residue Volume Multiplier
1.083x+0.083
Effective Mining Speed
3.2m³/s-0.2m³/s
est. 69 million ISK
Created byKane Savage
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




