Activation Cost
9.01GJ-3GJ
Activation time / duration
215.64s+15.64s
CPU usage
83.89tf+17.89tf
Critical Success Bonus Yield
173.51%-26.49%
Critical Success Chance
0.8%-0.2%
Mining amount
915.25m3-84.75m3
Optimal Range
10613m+613m
Powergrid Usage
14.59MW+4.59MW
Residue Probability
35.86%+1.86%
Residue Volume Multiplier
1.085x+0.085
Effective Mining Speed
4.3m³/s-0.8m³/s
est. 6.4 million ISK
Created byRenai Arkaral
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




