Activation Cost
10.5GJ+0.5GJ
Activation time / duration
87.66s+7.66s
CPU usage
97.11tf+31.11tf
Mining amount
126.67m3+26.67m3
Optimal Range
1574.63m+74.63m
Powergrid Usage
12.35MW+2.35MW
Residue Probability
34.76%+0.76%
Residue Volume Multiplier
1.127x+0.127
Mining Speed
1.45m³/s+0.2m³/s
+3
5 million ISKest. 60 million ISK
Created byRydwan Bilaen
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
233527534 | 2026-07-01 00:0018 hours ago | 2026-07-01 19:36in 2 hours | Yes | 5 million |
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.




