Abyssal Gas Cloud Harvester Gas Cloud Harvester II Unstable Gas Cloud Harvester Mutaplasmid
capacitorNeed
Activation Cost
11.31GJ +1.31GJ
duration
Activation time / duration
80.21s +0.21s
cpu
CPU usage
93.83tf +27.83tf
miningAmount
Mining amount
115.24m3 +15.24m3
maxRange
Optimal Range
1911.22m +411.23m
power
Powergrid Usage
10.08MW +0.08MW
miningWasteProbability
Residue Probability
29.86% -4.14%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.054x +0.054
miningSpeed
Mining Speed
1.44m³/s +0.19m³/s
est. 28 million ISK Created by Speedy Khunt

AI value prediction

Evaluated 7 d ago

Confidence Moderate R² 0.43
Bias score Moderate 438 samples
Avg. error (MAE) ±23M the lower, the better
Last trained 2 h ago
Training data
Faction 40Tech I 9Tech II 389
View historic sales →
Search type
Gas Cloud Harvester I
0
Gas Cloud Harvester II
0
ORE Gas Cloud Harvester
6