Frankie Doyles

Capsuleer

Modules for sale
0
Modules created
3,557
Total value
549 billion ISK
Goldbars
18
Brownbars
23

Category

Meta Group

Meta Level

Est. value

ISK 1M
ISK 100B
1M
10M
100M
1B
10B
100B
Sort
Display:
Attribute Bars:
Page 1
Mutated 'Excavator' Ice Harvesting Drone 'Excavator' Ice Harvesting Drone Exigent 'Excavator' Ice Harvesting Drone Mutaplasmid
duration
Activation time / duration
292.95s -17.05s
maxVelocity
Maximum Velocity
97.79m/sec +7.79m/sec
miningAmount
Mining amount
910.3m3 -89.7m3
maxRange
Optimal Range
5562.25m +562.25m
miningWasteProbability
Residue Probability
63.02% +3.02%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.805x -0.195
miningSpeed
Mining Speed
3.11m³/s -0.12m³/s
No estimate available Created by Frankie Doyles
Mutated 'Excavator' Ice Harvesting Drone 'Excavator' Ice Harvesting Drone Exigent 'Excavator' Ice Harvesting Drone Mutaplasmid
duration
Activation time / duration
320.97s +10.97s
maxVelocity
Maximum Velocity
69.44m/sec -20.56m/sec
miningAmount
Mining amount
952.6m3 -47.4m3
maxRange
Optimal Range
4734.5m -265.5m
miningWasteProbability
Residue Probability
56.08% -3.92%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.914x -0.086
miningSpeed
Mining Speed
2.97m³/s -0.26m³/s
No estimate available Created by Frankie Doyles
Mutated 'Excavator' Ice Harvesting Drone 'Excavator' Ice Harvesting Drone Exigent 'Excavator' Ice Harvesting Drone Mutaplasmid
duration
Activation time / duration
307.46s -2.54s
maxVelocity
Maximum Velocity
82.89m/sec -7.12m/sec
miningAmount
Mining amount
1294.15m3 +294.15m3
maxRange
Optimal Range
5369.75m +369.75m
miningWasteProbability
Residue Probability
63.56% +3.56%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.804x -0.196
miningSpeed
Mining Speed
4.21m³/s +0.98m³/s
No estimate available Created by Frankie Doyles
Abyssal Entropic Radiation Sink Entropic Radiation Sink II Unstable Entropic Radiation Sink Mutaplasmid
cpu
CPU usage
38.11tf +8.11tf
damageMultiplier
Damage Modifier
1.12x -0.01
speedMultiplier
Rate of Fire Bonus
6.963% +0.96%
dpsIncreaseTurrets
DPS Increase
20.35% +0.14%
est. 4.4 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
33.7GJ +3.7GJ
duration
Activation time / duration
47.09s +2.09s
cpu
CPU usage
75.76tf +15.76tf
miningCritBonusYield
Critical Success Bonus Yield
170.99% -29.01%
miningCritChance
Critical Success Chance
0.98% -0.02%
miningAmount
Mining amount
113.02m3 -6.98m3
maxRange
Optimal Range
12438m -2562m
power
Powergrid Usage
13MW +1MW
miningWasteProbability
Residue Probability
34.86% +0.86%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.046x +0.046
effectiveMiningSpeed
Effective Mining Speed
2.44m³/s -0.28m³/s
est. 5.4 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.99GJ +1.99GJ
duration
Activation time / duration
44.84s -0.16s
cpu
CPU usage
73.96tf +13.96tf
miningCritBonusYield
Critical Success Bonus Yield
195% -5%
miningCritChance
Critical Success Chance
0.92% -0.08%
miningAmount
Mining amount
107.83m3 -12.17m3
maxRange
Optimal Range
14409.75m -590.25m
power
Powergrid Usage
10.74MW -1.26MW
miningWasteProbability
Residue Probability
36% +2%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.862x -0.138
effectiveMiningSpeed
Effective Mining Speed
2.45m³/s -0.27m³/s
est. 8.4 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.81GJ +5.81GJ
duration
Activation time / duration
46.54s +1.54s
cpu
CPU usage
61.48tf +1.48tf
miningCritBonusYield
Critical Success Bonus Yield
174.98% -25.02%
miningCritChance
Critical Success Chance
0.67% -0.33%
miningAmount
Mining amount
105.35m3 -14.65m3
maxRange
Optimal Range
12594.75m -2405.25m
power
Powergrid Usage
11.99MW -0.01MW
miningWasteProbability
Residue Probability
36.02% +2.02%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.059x +0.059
effectiveMiningSpeed
Effective Mining Speed
2.29m³/s -0.43m³/s
est. 8.8 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
36.6GJ +6.6GJ
duration
Activation time / duration
46.73s +1.73s
cpu
CPU usage
70.93tf +10.93tf
miningCritBonusYield
Critical Success Bonus Yield
179.95% -20.05%
miningCritChance
Critical Success Chance
0.89% -0.11%
miningAmount
Mining amount
112.21m3 -7.79m3
maxRange
Optimal Range
15309m +309m
power
Powergrid Usage
11.86MW -0.14MW
miningWasteProbability
Residue Probability
44.14% +10.14%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.085x +0.085
effectiveMiningSpeed
Effective Mining Speed
2.44m³/s -0.28m³/s
est. 8.8 million ISK Created by Frankie Doyles
Abyssal Ice Harvester ORE Ice Harvester Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
12.13GJ +0.13GJ
duration
Activation time / duration
211.8s +11.8s
cpu
CPU usage
71.33tf +21.32tf
miningCritBonusYield
Critical Success Bonus Yield
199.69% -0.31%
miningCritChance
Critical Success Chance
1.04% +0.04%
miningAmount
Mining amount
926.95m3 -73.05m3
maxRange
Optimal Range
10495.63m -2004.38m
power
Powergrid Usage
10.87MW +0.87MW
effectiveMiningSpeed
Effective Mining Speed
4.47m³/s -0.63m³/s
est. 9.5 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
32.52GJ +2.52GJ
duration
Activation time / duration
47.89s +2.89s
cpu
CPU usage
66.98tf +6.98tf
miningCritBonusYield
Critical Success Bonus Yield
163.57% -36.43%
miningCritChance
Critical Success Chance
0.89% -0.11%
miningAmount
Mining amount
105.29m3 -14.71m3
maxRange
Optimal Range
16431m +1431m
power
Powergrid Usage
12.34MW +0.34MW
miningWasteProbability
Residue Probability
40.65% +6.65%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.087x +0.087
effectiveMiningSpeed
Effective Mining Speed
2.23m³/s -0.49m³/s
est. 9.8 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.95GJ +5.95GJ
duration
Activation time / duration
47.02s +2.02s
cpu
CPU usage
64.34tf +4.34tf
miningCritBonusYield
Critical Success Bonus Yield
175.19% -24.81%
miningCritChance
Critical Success Chance
0.92% -0.08%
miningAmount
Mining amount
110.1m3 -9.9m3
maxRange
Optimal Range
12000.75m -2999.25m
power
Powergrid Usage
14.46MW +2.46MW
miningWasteProbability
Residue Probability
33.39% -0.61%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.972x -0.028
effectiveMiningSpeed
Effective Mining Speed
2.38m³/s -0.34m³/s
est. 9.8 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.67GJ +5.67GJ
duration
Activation time / duration
47.14s +2.14s
cpu
CPU usage
67.52tf +7.52tf
miningCritBonusYield
Critical Success Bonus Yield
177.2% -22.8%
miningCritChance
Critical Success Chance
1.07% +0.07%
miningAmount
Mining amount
115.31m3 -4.69m3
maxRange
Optimal Range
16934.25m +1934.25m
power
Powergrid Usage
13.86MW +1.86MW
miningWasteProbability
Residue Probability
34.09% +0.1%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.068x +0.068
effectiveMiningSpeed
Effective Mining Speed
2.49m³/s -0.23m³/s
est. 10 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
29.4GJ -0.6GJ
duration
Activation time / duration
47.16s +2.16s
cpu
CPU usage
65.47tf +5.47tf
miningCritBonusYield
Critical Success Bonus Yield
172.65% -27.35%
miningCritChance
Critical Success Chance
0.93% -0.07%
miningAmount
Mining amount
110.16m3 -9.84m3
maxRange
Optimal Range
14187m -813m
power
Powergrid Usage
10.45MW -1.55MW
miningWasteProbability
Residue Probability
39.32% +5.32%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.051x +0.051
effectiveMiningSpeed
Effective Mining Speed
2.37m³/s -0.35m³/s
est. 10 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.2GJ +1.2GJ
duration
Activation time / duration
45.36s +0.36s
cpu
CPU usage
68.37tf +8.37tf
miningCritBonusYield
Critical Success Bonus Yield
174% -26%
miningCritChance
Critical Success Chance
1.06% +0.06%
miningAmount
Mining amount
109.78m3 -10.22m3
maxRange
Optimal Range
13213.5m -1786.5m
power
Powergrid Usage
14.08MW +2.08MW
miningWasteProbability
Residue Probability
38.71% +4.71%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.026x +0.026
effectiveMiningSpeed
Effective Mining Speed
2.46m³/s -0.26m³/s
est. 10 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
29.16GJ -0.84GJ
duration
Activation time / duration
46.9s +1.9s
cpu
CPU usage
67.53tf +7.53tf
miningCritBonusYield
Critical Success Bonus Yield
168.54% -31.46%
miningCritChance
Critical Success Chance
1.13% +0.13%
miningAmount
Mining amount
109.18m3 -10.82m3
maxRange
Optimal Range
14987.25m -12.75m
power
Powergrid Usage
11.5MW -0.5MW
miningWasteProbability
Residue Probability
42.16% +8.16%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.933x -0.067
effectiveMiningSpeed
Effective Mining Speed
2.37m³/s -0.35m³/s
est. 11 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
36.31GJ +6.31GJ
duration
Activation time / duration
47.53s +2.53s
cpu
CPU usage
65.98tf +5.98tf
miningCritBonusYield
Critical Success Bonus Yield
173.86% -26.14%
miningCritChance
Critical Success Chance
0.89% -0.11%
miningAmount
Mining amount
116.69m3 -3.31m3
maxRange
Optimal Range
17643.75m +2643.75m
power
Powergrid Usage
14.26MW +2.26MW
miningWasteProbability
Residue Probability
34.73% +0.73%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.999x -0.001
effectiveMiningSpeed
Effective Mining Speed
2.49m³/s -0.23m³/s
est. 11 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
36.65GJ +6.65GJ
duration
Activation time / duration
44.43s -0.57s
cpu
CPU usage
71.02tf +11.02tf
miningCritBonusYield
Critical Success Bonus Yield
196.05% -3.95%
miningCritChance
Critical Success Chance
0.98% -0.02%
miningAmount
Mining amount
117.66m3 -2.34m3
maxRange
Optimal Range
15713.25m +713.25m
power
Powergrid Usage
12.72MW +0.72MW
miningWasteProbability
Residue Probability
36.16% +2.16%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.091x +0.091
effectiveMiningSpeed
Effective Mining Speed
2.7m³/s -0.02m³/s
est. 11 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.04GJ +5.04GJ
duration
Activation time / duration
44.51s -0.49s
cpu
CPU usage
66.35tf +6.35tf
miningCritBonusYield
Critical Success Bonus Yield
178.06% -21.94%
miningCritChance
Critical Success Chance
0.85% -0.15%
miningAmount
Mining amount
115.45m3 -4.55m3
maxRange
Optimal Range
12042m -2958m
power
Powergrid Usage
11.25MW -0.75MW
miningWasteProbability
Residue Probability
39.57% +5.57%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.988x -0.012
effectiveMiningSpeed
Effective Mining Speed
2.63m³/s -0.09m³/s
est. 11 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.59GJ -3.41GJ
duration
Activation time / duration
47.35s +2.35s
cpu
CPU usage
60.35tf +0.35tf
miningCritBonusYield
Critical Success Bonus Yield
190.59% -9.41%
miningCritChance
Critical Success Chance
0.7% -0.3%
miningAmount
Mining amount
109.02m3 -10.98m3
maxRange
Optimal Range
13428m -1572m
power
Powergrid Usage
13.46MW +1.46MW
miningWasteProbability
Residue Probability
37.12% +3.12%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.134x +0.134
effectiveMiningSpeed
Effective Mining Speed
2.33m³/s -0.39m³/s
est. 11 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.53GJ -2.47GJ
duration
Activation time / duration
47.27s +2.27s
cpu
CPU usage
76.85tf +16.85tf
miningCritBonusYield
Critical Success Bonus Yield
173.51% -26.49%
miningCritChance
Critical Success Chance
1.16% +0.16%
miningAmount
Mining amount
114.1m3 -5.9m3
maxRange
Optimal Range
13881.75m -1118.25m
power
Powergrid Usage
12.83MW +0.83MW
miningWasteProbability
Residue Probability
32.51% -1.49%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.943x -0.057
effectiveMiningSpeed
Effective Mining Speed
2.46m³/s -0.26m³/s
est. 11 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
36.46GJ +6.46GJ
duration
Activation time / duration
47.43s +2.43s
cpu
CPU usage
67.49tf +7.49tf
miningCritBonusYield
Critical Success Bonus Yield
179.53% -20.47%
miningCritChance
Critical Success Chance
0.95% -0.04%
miningAmount
Mining amount
109.56m3 -10.44m3
maxRange
Optimal Range
16629m +1629m
power
Powergrid Usage
13.86MW +1.86MW
miningWasteProbability
Residue Probability
29.37% -4.63%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.011x +0.011
effectiveMiningSpeed
Effective Mining Speed
2.35m³/s -0.37m³/s
est. 12 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.42GJ -3.58GJ
duration
Activation time / duration
47.81s +2.81s
cpu
CPU usage
61.02tf +1.02tf
miningCritBonusYield
Critical Success Bonus Yield
173.44% -26.56%
miningCritChance
Critical Success Chance
0.85% -0.15%
miningAmount
Mining amount
112.1m3 -7.9m3
maxRange
Optimal Range
12669m -2331m
power
Powergrid Usage
11.1MW -0.9MW
miningWasteProbability
Residue Probability
38.9% +4.9%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.103x +0.103
effectiveMiningSpeed
Effective Mining Speed
2.38m³/s -0.34m³/s
est. 12 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.44GJ +4.44GJ
duration
Activation time / duration
46.44s +1.44s
cpu
CPU usage
72.57tf +12.57tf
miningCritBonusYield
Critical Success Bonus Yield
183.66% -16.34%
miningCritChance
Critical Success Chance
0.7% -0.3%
miningAmount
Mining amount
120.74m3 +0.74m3
maxRange
Optimal Range
14203.5m -796.5m
power
Powergrid Usage
11.68MW -0.33MW
miningWasteProbability
Residue Probability
43.06% +9.06%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.907x -0.093
effectiveMiningSpeed
Effective Mining Speed
2.63m³/s -0.09m³/s
est. 12 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
21.79GJ -8.21GJ
duration
Activation time / duration
46.14s +1.14s
cpu
CPU usage
76.31tf +16.31tf
miningCritBonusYield
Critical Success Bonus Yield
201.37% +1.37%
miningCritChance
Critical Success Chance
0.71% -0.29%
miningAmount
Mining amount
112.58m3 -7.42m3
maxRange
Optimal Range
11794.5m -3205.5m
power
Powergrid Usage
11.1MW -0.9MW
miningWasteProbability
Residue Probability
32.53% -1.47%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.074x +0.074
effectiveMiningSpeed
Effective Mining Speed
2.48m³/s -0.24m³/s
est. 12 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
29.14GJ -0.86GJ
duration
Activation time / duration
47.79s +2.79s
cpu
CPU usage
63.75tf +3.75tf
miningCritBonusYield
Critical Success Bonus Yield
203.12% +3.12%
miningCritChance
Critical Success Chance
1.02% +0.02%
miningAmount
Mining amount
107.83m3 -12.17m3
maxRange
Optimal Range
14888.25m -111.75m
power
Powergrid Usage
12.39MW +0.39MW
miningWasteProbability
Residue Probability
31.98% -2.02%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.874x -0.126
effectiveMiningSpeed
Effective Mining Speed
2.3m³/s -0.42m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
37.68GJ +7.68GJ
duration
Activation time / duration
47.7s +2.7s
cpu
CPU usage
67.78tf +7.78tf
miningCritBonusYield
Critical Success Bonus Yield
179.46% -20.54%
miningCritChance
Critical Success Chance
1% 0%
miningAmount
Mining amount
120.58m3 +0.58m3
maxRange
Optimal Range
15515.25m +515.25m
power
Powergrid Usage
10.6MW -1.4MW
miningWasteProbability
Residue Probability
34.73% +0.73%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.891x -0.109
effectiveMiningSpeed
Effective Mining Speed
2.57m³/s -0.15m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.22GJ -2.78GJ
duration
Activation time / duration
45.55s +0.55s
cpu
CPU usage
60.01tf +0.01tf
miningCritBonusYield
Critical Success Bonus Yield
187.16% -12.84%
miningCritChance
Critical Success Chance
0.97% -0.03%
miningAmount
Mining amount
108.48m3 -11.52m3
maxRange
Optimal Range
11547m -3453m
power
Powergrid Usage
11.64MW -0.36MW
miningWasteProbability
Residue Probability
37.22% +3.22%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.097x +0.097
effectiveMiningSpeed
Effective Mining Speed
2.42m³/s -0.29m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.54GJ -3.46GJ
duration
Activation time / duration
47.13s +2.13s
cpu
CPU usage
74.96tf +14.96tf
miningCritBonusYield
Critical Success Bonus Yield
180.72% -19.28%
miningCritChance
Critical Success Chance
0.81% -0.19%
miningAmount
Mining amount
116.63m3 -3.37m3
maxRange
Optimal Range
11547m -3453m
power
Powergrid Usage
12.63MW +0.63MW
miningWasteProbability
Residue Probability
42.14% +8.14%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.139x +0.139
effectiveMiningSpeed
Effective Mining Speed
2.51m³/s -0.21m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
39.36GJ +9.36GJ
duration
Activation time / duration
44.65s -0.35s
cpu
CPU usage
65.81tf +5.81tf
miningCritBonusYield
Critical Success Bonus Yield
182.96% -17.04%
miningCritChance
Critical Success Chance
0.73% -0.27%
miningAmount
Mining amount
107.24m3 -12.76m3
maxRange
Optimal Range
14500.5m -499.5m
power
Powergrid Usage
12.1MW +0.1MW
miningWasteProbability
Residue Probability
32.27% -1.73%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.068x +0.068
effectiveMiningSpeed
Effective Mining Speed
2.43m³/s -0.29m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
37.78GJ +7.78GJ
duration
Activation time / duration
48.38s +3.38s
cpu
CPU usage
65.14tf +5.14tf
miningCritBonusYield
Critical Success Bonus Yield
201.58% +1.58%
miningCritChance
Critical Success Chance
0.75% -0.25%
miningAmount
Mining amount
114.04m3 -5.96m3
maxRange
Optimal Range
14434.5m -565.5m
power
Powergrid Usage
14.09MW +2.09MW
miningWasteProbability
Residue Probability
31.78% -2.22%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.092x +0.092
effectiveMiningSpeed
Effective Mining Speed
2.39m³/s -0.33m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
40.34GJ +10.34GJ
duration
Activation time / duration
45.2s +0.2s
cpu
CPU usage
76.35tf +16.35tf
miningCritBonusYield
Critical Success Bonus Yield
180.3% -19.7%
miningCritChance
Critical Success Chance
1.14% +0.14%
miningAmount
Mining amount
115.39m3 -4.61m3
maxRange
Optimal Range
14789.25m -210.75m
power
Powergrid Usage
12.6MW +0.6MW
miningWasteProbability
Residue Probability
33.63% -0.37%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.974x -0.026
effectiveMiningSpeed
Effective Mining Speed
2.61m³/s -0.11m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
23.57GJ -6.43GJ
duration
Activation time / duration
46.82s +1.82s
cpu
CPU usage
60.77tf +0.77tf
miningCritBonusYield
Critical Success Bonus Yield
204.17% +4.17%
miningCritChance
Critical Success Chance
0.83% -0.17%
miningAmount
Mining amount
106.91m3 -13.09m3
maxRange
Optimal Range
14706.75m -293.25m
power
Powergrid Usage
10.72MW -1.28MW
miningWasteProbability
Residue Probability
35.47% +1.47%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.089x +0.089
effectiveMiningSpeed
Effective Mining Speed
2.32m³/s -0.4m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.27GJ +4.27GJ
duration
Activation time / duration
46.09s +1.09s
cpu
CPU usage
75.26tf +15.26tf
miningCritBonusYield
Critical Success Bonus Yield
160.84% -39.16%
miningCritChance
Critical Success Chance
1.22% +0.22%
miningAmount
Mining amount
109.29m3 -10.71m3
maxRange
Optimal Range
13188.75m -1811.25m
power
Powergrid Usage
13.57MW +1.57MW
miningWasteProbability
Residue Probability
37.49% +3.49%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.031x +0.031
effectiveMiningSpeed
Effective Mining Speed
2.42m³/s -0.3m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
41.54GJ +11.54GJ
duration
Activation time / duration
47.48s +2.48s
cpu
CPU usage
74.25tf +14.25tf
miningCritBonusYield
Critical Success Bonus Yield
162.66% -37.34%
miningCritChance
Critical Success Chance
1.06% +0.06%
miningAmount
Mining amount
115.5m3 -4.5m3
maxRange
Optimal Range
16975.5m +1975.5m
power
Powergrid Usage
13.68MW +1.68MW
miningWasteProbability
Residue Probability
36.77% +2.77%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.958x -0.042
effectiveMiningSpeed
Effective Mining Speed
2.48m³/s -0.24m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
28.01GJ -1.99GJ
duration
Activation time / duration
48.33s +3.33s
cpu
CPU usage
63.46tf +3.46tf
miningCritBonusYield
Critical Success Bonus Yield
180.51% -19.49%
miningCritChance
Critical Success Chance
0.7% -0.3%
miningAmount
Mining amount
112.69m3 -7.31m3
maxRange
Optimal Range
11926.5m -3073.5m
power
Powergrid Usage
11.68MW -0.33MW
miningWasteProbability
Residue Probability
28.96% -5.04%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.146x +0.146
effectiveMiningSpeed
Effective Mining Speed
2.36m³/s -0.36m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
38.02GJ +8.02GJ
duration
Activation time / duration
47.49s +2.49s
cpu
CPU usage
59.63tf -0.37tf
miningCritBonusYield
Critical Success Bonus Yield
168.54% -31.46%
miningCritChance
Critical Success Chance
1.02% +0.02%
miningAmount
Mining amount
107.4m3 -12.6m3
maxRange
Optimal Range
11662.5m -3337.5m
power
Powergrid Usage
12.76MW +0.76MW
miningWasteProbability
Residue Probability
30.84% -3.16%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.124x +0.124
effectiveMiningSpeed
Effective Mining Speed
2.3m³/s -0.42m³/s
est. 13 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.79GJ -2.21GJ
duration
Activation time / duration
44.13s -0.87s
cpu
CPU usage
66.23tf +6.23tf
miningCritBonusYield
Critical Success Bonus Yield
194.58% -5.42%
miningCritChance
Critical Success Chance
0.67% -0.33%
miningAmount
Mining amount
114.58m3 -5.42m3
maxRange
Optimal Range
13329m -1671m
power
Powergrid Usage
13.98MW +1.99MW
miningWasteProbability
Residue Probability
40.04% +6.04%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.03x +0.03
effectiveMiningSpeed
Effective Mining Speed
2.63m³/s -0.09m³/s
est. 14 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
19.63GJ -10.37GJ
duration
Activation time / duration
45.94s +0.94s
cpu
CPU usage
68.03tf +8.03tf
miningCritBonusYield
Critical Success Bonus Yield
188.21% -11.79%
miningCritChance
Critical Success Chance
0.67% -0.33%
miningAmount
Mining amount
107.35m3 -12.65m3
maxRange
Optimal Range
15300.75m +300.75m
power
Powergrid Usage
11.04MW -0.95MW
miningWasteProbability
Residue Probability
42.96% +8.96%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.973x -0.027
effectiveMiningSpeed
Effective Mining Speed
2.37m³/s -0.35m³/s
est. 14 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.94GJ -2.06GJ
duration
Activation time / duration
48.5s +3.5s
cpu
CPU usage
66.52tf +6.52tf
miningCritBonusYield
Critical Success Bonus Yield
160.84% -39.16%
miningCritChance
Critical Success Chance
1.19% +0.19%
miningAmount
Mining amount
104.65m3 -15.35m3
maxRange
Optimal Range
15886.5m +886.5m
power
Powergrid Usage
13.22MW +1.22MW
miningWasteProbability
Residue Probability
35.94% +1.94%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.865x -0.135
effectiveMiningSpeed
Effective Mining Speed
2.2m³/s -0.52m³/s
est. 14 million ISK Created by Frankie Doyles
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.08GJ +1.08GJ
duration
Activation time / duration
48.75s +3.75s
cpu
CPU usage
68.24tf +8.24tf
miningCritBonusYield
Critical Success Bonus Yield
201.93% +1.93%
miningCritChance
Critical Success Chance
1.18% +0.18%
miningAmount
Mining amount
114.58m3 -5.42m3
maxRange
Optimal Range
16959m +1959m
power
Powergrid Usage
13.56MW +1.56MW
miningWasteProbability
Residue Probability
35.51% +1.51%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.879x -0.121
effectiveMiningSpeed
Effective Mining Speed
2.41m³/s -0.31m³/s
est. 14 million ISK Created by Frankie Doyles
Display:
Attribute Bars:
Page 1