Modules for Sale

All modules on contracts and public assets

For sale
12,650
Auctions
81
Exchanges
10,180
Added 24h
2,505

Category

Meta Group

Meta Level

Price

ISK 1M
ISK 100B
1M
10M
100M
1B
10B
100B
Sort

Est. value

ISK 1M
ISK 100B
1M
10M
100M
1B
10B
100B
Sort

Activation Cost Activation Cost

GJ
GJ
42GJ
37.2GJ
32.4GJ
27.6GJ
22.8GJ
18GJ
Sort

Activation time / duration Activation time / duration

s
s
49.5s
47.7s
45.9s
44.1s
42.3s
40.5s
Sort

CPU usage CPU usage

tf
tf
90tf
81.6tf
73.2tf
64.8tf
56.4tf
48tf
Sort

Critical Success Bonus Yield Critical Success Bonus Yield

%
%
160%
174%
188%
202%
216%
230%
Sort

Critical Success Chance Critical Success Chance

%
%
0.65%
0.78%
0.91%
1.04%
1.17%
1.3%
Sort

Mining amount Mining amount

m3
m3
102m3
112.8m3
123.6m3
134.4m3
145.2m3
156m3
Sort

Optimal Range Optimal Range

m
m
11250m
12900m
14550m
16200m
17850m
19500m
Sort

Powergrid Usage Powergrid Usage

MW
MW
18MW
16.32MW
14.64MW
12.96MW
11.28MW
9.6MW
Sort

Residue Probability Residue Probability

%
%
44.2%
40.12%
36.04%
31.96%
27.88%
23.8%
Sort

Residue Volume Multiplier Residue Volume Multiplier

x
x
1.15x
1.08x
1.01x
0.94x
0.87x
0.8x
Sort

Effective Mining Speed Effective Mining Speed

m³/s
m³/s
2.08m³/s
2.46m³/s
2.84m³/s
3.21m³/s
3.59m³/s
3.97m³/s
Sort
Display:
Attribute Bars:
Page 15
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
32.28GJ +2.28GJ
duration
Activation time / duration
42.8s -2.2s
cpu
CPU usage
61.64tf +1.64tf
miningCritBonusYield
Critical Success Bonus Yield
208.9% +8.9%
miningCritChance
Critical Success Chance
1.09% +0.09%
miningAmount
Mining amount
137.3m3 +17.3m3
maxRange
Optimal Range
17022m +2022m
power
Powergrid Usage
12.38MW +0.38MW
miningWasteProbability
Residue Probability
33.77% -0.23%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.935x -0.065
effectiveMiningSpeed
Effective Mining Speed
3.28m³/s +0.56m³/s
Shenro
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
32.91GJ +2.91GJ
duration
Activation time / duration
48.08s +3.08s
cpu
CPU usage
67.61tf +7.61tf
miningCritBonusYield
Critical Success Bonus Yield
218.4% +18.4%
miningCritChance
Critical Success Chance
0.94% -0.06%
miningAmount
Mining amount
133.13m3 +13.13m3
maxRange
Optimal Range
15989.25m +989.25m
power
Powergrid Usage
11.17MW -0.83MW
miningWasteProbability
Residue Probability
29.82% -4.17%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.055x +0.055
effectiveMiningSpeed
Effective Mining Speed
2.83m³/s +0.11m³/s
Shenro
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26GJ -4GJ
duration
Activation time / duration
47.04s +2.04s
cpu
CPU usage
69.12tf +9.12tf
miningCritBonusYield
Critical Success Bonus Yield
203.85% +3.85%
miningCritChance
Critical Success Chance
0.95% -0.05%
miningAmount
Mining amount
121.21m3 +1.21m3
maxRange
Optimal Range
12722.25m -2277.75m
power
Powergrid Usage
10.4MW -1.6MW
miningWasteProbability
Residue Probability
35.73% +1.73%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.876x -0.124
effectiveMiningSpeed
Effective Mining Speed
2.63m³/s -0.09m³/s
Shenro
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.98GJ +4.98GJ
duration
Activation time / duration
46.16s +1.16s
cpu
CPU usage
64.93tf +4.93tf
miningCritBonusYield
Critical Success Bonus Yield
203.5% +3.5%
miningCritChance
Critical Success Chance
0.76% -0.24%
miningAmount
Mining amount
121.64m3 +1.64m3
maxRange
Optimal Range
14882.25m -117.75m
power
Powergrid Usage
12.47MW +0.47MW
miningWasteProbability
Residue Probability
36.39% +2.39%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.976x -0.024
effectiveMiningSpeed
Effective Mining Speed
2.68m³/s -0.04m³/s
Shenro
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
36.36GJ +6.36GJ
duration
Activation time / duration
47.96s +2.96s
cpu
CPU usage
60.91tf +0.91tf
miningCritBonusYield
Critical Success Bonus Yield
178.3% -21.7%
miningCritChance
Critical Success Chance
0.84% -0.16%
miningAmount
Mining amount
119.16m3 -0.84m3
maxRange
Optimal Range
12560.25m -2439.75m
power
Powergrid Usage
10.7MW -1.3MW
miningWasteProbability
Residue Probability
35.33% +1.33%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.025x +0.025
effectiveMiningSpeed
Effective Mining Speed
2.52m³/s -0.2m³/s
Shenro
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.52GJ -5.47GJ
duration
Activation time / duration
44.36s -0.64s
cpu
CPU usage
52.89tf -7.11tf
miningCritBonusYield
Critical Success Bonus Yield
186.8% -13.2%
miningCritChance
Critical Success Chance
1.19% +0.19%
miningAmount
Mining amount
127.22m3 +7.22m3
maxRange
Optimal Range
16650.75m +1650.75m
power
Powergrid Usage
14.78MW +2.78MW
miningWasteProbability
Residue Probability
37.33% +3.33%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.005x +0.005
effectiveMiningSpeed
Effective Mining Speed
2.93m³/s +0.21m³/s
Shenro
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
32.94GJ +2.94GJ
duration
Activation time / duration
43.82s -1.18s
cpu
CPU usage
54.29tf -5.71tf
miningCritBonusYield
Critical Success Bonus Yield
219.2% +19.2%
miningCritChance
Critical Success Chance
1.12% +0.12%
miningAmount
Mining amount
134.21m3 +14.21m3
maxRange
Optimal Range
14470.5m -529.5m
power
Powergrid Usage
14.35MW +2.35MW
miningWasteProbability
Residue Probability
27.83% -6.17%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.028x +0.028
effectiveMiningSpeed
Effective Mining Speed
3.14m³/s +0.42m³/s
Shenro
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
28.16GJ -1.84GJ
duration
Activation time / duration
47.45s +2.45s
cpu
CPU usage
57.26tf -2.74tf
miningCritBonusYield
Critical Success Bonus Yield
184.35% -15.65%
miningCritChance
Critical Success Chance
1.08% +0.08%
miningAmount
Mining amount
116.68m3 -3.32m3
maxRange
Optimal Range
12189m -2811m
power
Powergrid Usage
10.37MW -1.63MW
miningWasteProbability
Residue Probability
29.87% -4.13%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.03x +0.03
effectiveMiningSpeed
Effective Mining Speed
2.51m³/s -0.21m³/s
Shenro
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
25.9GJ -4.1GJ
duration
Activation time / duration
45.45s +0.45s
cpu
CPU usage
70.76tf +10.76tf
miningCritBonusYield
Critical Success Bonus Yield
193.04% -6.96%
miningCritChance
Critical Success Chance
1.07% +0.07%
miningAmount
Mining amount
126.46m3 +6.46m3
maxRange
Optimal Range
12718.5m -2281.5m
power
Powergrid Usage
15.04MW +3.04MW
miningWasteProbability
Residue Probability
35.65% +1.65%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.843x -0.157
effectiveMiningSpeed
Effective Mining Speed
2.84m³/s +0.12m³/s
+4
56 million ISK est. 36 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.84GJ -5.16GJ
duration
Activation time / duration
46.76s +1.76s
cpu
CPU usage
81.35tf +21.35tf
miningCritBonusYield
Critical Success Bonus Yield
160.7% -39.3%
miningCritChance
Critical Success Chance
1.15% +0.15%
miningAmount
Mining amount
139.85m3 +19.85m3
maxRange
Optimal Range
14550m -450m
power
Powergrid Usage
17.39MW +5.39MW
miningWasteProbability
Residue Probability
40.77% +6.77%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.123x +0.123
effectiveMiningSpeed
Effective Mining Speed
3.05m³/s +0.33m³/s
56 million ISK est. 76 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.52GJ -5.47GJ
duration
Activation time / duration
46.81s +1.81s
cpu
CPU usage
65.09tf +5.09tf
miningCritBonusYield
Critical Success Bonus Yield
217.85% +17.85%
miningCritChance
Critical Success Chance
1.13% +0.13%
miningAmount
Mining amount
142.24m3 +22.24m3
maxRange
Optimal Range
14997m -3m
power
Powergrid Usage
14.65MW +2.65MW
miningWasteProbability
Residue Probability
35.33% +1.33%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.976x -0.024
effectiveMiningSpeed
Effective Mining Speed
3.11m³/s +0.39m³/s
Entitiez
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
20.95GJ -9.05GJ
duration
Activation time / duration
43.3s -1.7s
cpu
CPU usage
66.02tf +6.02tf
miningCritBonusYield
Critical Success Bonus Yield
167.35% -32.65%
miningCritChance
Critical Success Chance
0.95% -0.05%
miningAmount
Mining amount
105.29m3 -14.71m3
maxRange
Optimal Range
19450.5m +4450.5m
power
Powergrid Usage
16.17MW +4.17MW
miningWasteProbability
Residue Probability
33.04% -0.96%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.981x -0.019
effectiveMiningSpeed
Effective Mining Speed
2.47m³/s -0.25m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
28.37GJ -1.63GJ
duration
Activation time / duration
41.28s -3.72s
cpu
CPU usage
74.54tf +14.54tf
miningCritBonusYield
Critical Success Bonus Yield
228.25% +28.25%
miningCritChance
Critical Success Chance
1.05% +0.05%
miningAmount
Mining amount
106.05m3 -13.95m3
maxRange
Optimal Range
12042m -2958m
power
Powergrid Usage
16.43MW +4.43MW
miningWasteProbability
Residue Probability
34.18% +0.18%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.919x -0.081
effectiveMiningSpeed
Effective Mining Speed
2.63m³/s -0.09m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
18.67GJ -11.33GJ
duration
Activation time / duration
40.55s -4.45s
cpu
CPU usage
67.07tf +7.07tf
miningCritBonusYield
Critical Success Bonus Yield
198.57% -1.43%
miningCritChance
Critical Success Chance
1.13% +0.13%
miningAmount
Mining amount
120.68m3 +0.68m3
maxRange
Optimal Range
14682m -318m
power
Powergrid Usage
15.2MW +3.2MW
miningWasteProbability
Residue Probability
30.88% -3.12%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.113x +0.113
effectiveMiningSpeed
Effective Mining Speed
3.04m³/s +0.32m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
38.23GJ +8.23GJ
duration
Activation time / duration
45.44s +0.44s
cpu
CPU usage
75.3tf +15.3tf
miningCritBonusYield
Critical Success Bonus Yield
207.74% +7.74%
miningCritChance
Critical Success Chance
0.89% -0.11%
miningAmount
Mining amount
142.01m3 +22.01m3
maxRange
Optimal Range
18064.5m +3064.5m
power
Powergrid Usage
15.51MW +3.51MW
miningWasteProbability
Residue Probability
25.09% -8.91%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.851x -0.149
effectiveMiningSpeed
Effective Mining Speed
3.18m³/s +0.46m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
41.35GJ +11.35GJ
duration
Activation time / duration
45.62s +0.62s
cpu
CPU usage
79.08tf +19.08tf
miningCritBonusYield
Critical Success Bonus Yield
194.65% -5.35%
miningCritChance
Critical Success Chance
1.25% +0.25%
miningAmount
Mining amount
145.04m3 +25.04m3
maxRange
Optimal Range
11728.5m -3271.5m
power
Powergrid Usage
16.05MW +4.05MW
miningWasteProbability
Residue Probability
36.1% +2.1%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.022x +0.022
effectiveMiningSpeed
Effective Mining Speed
3.26m³/s +0.54m³/s
170 million ISK est. 170 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.22GJ -5.78GJ
duration
Activation time / duration
41.21s -3.79s
cpu
CPU usage
57.03tf -2.97tf
miningCritBonusYield
Critical Success Bonus Yield
186.25% -13.75%
miningCritChance
Critical Success Chance
0.66% -0.34%
miningAmount
Mining amount
132.73m3 +12.73m3
maxRange
Optimal Range
11266.5m -3733.5m
power
Powergrid Usage
13.68MW +1.68MW
miningWasteProbability
Residue Probability
38.75% +4.75%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.874x -0.126
effectiveMiningSpeed
Effective Mining Speed
3.26m³/s +0.54m³/s
100 million ISK est. 180 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.08GJ +4.08GJ
duration
Activation time / duration
45.36s +0.36s
cpu
CPU usage
86.18tf +26.18tf
miningCritBonusYield
Critical Success Bonus Yield
199.34% -0.66%
miningCritChance
Critical Success Chance
0.96% -0.04%
miningAmount
Mining amount
135.97m3 +15.97m3
maxRange
Optimal Range
15185.25m +185.25m
power
Powergrid Usage
12.76MW +0.76MW
miningWasteProbability
Residue Probability
39.65% +5.65%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.925x -0.075
effectiveMiningSpeed
Effective Mining Speed
3.06m³/s +0.34m³/s
67 million ISK est. 98 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
29.9GJ -0.1GJ
duration
Activation time / duration
42.15s -2.85s
cpu
CPU usage
83.36tf +23.36tf
miningCritBonusYield
Critical Success Bonus Yield
181.35% -18.65%
miningCritChance
Critical Success Chance
1.28% +0.28%
miningAmount
Mining amount
107.94m3 -12.06m3
maxRange
Optimal Range
15564.75m +564.75m
power
Powergrid Usage
14.52MW +2.52MW
miningWasteProbability
Residue Probability
35.63% +1.63%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.046x +0.046
effectiveMiningSpeed
Effective Mining Speed
2.62m³/s -0.1m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
30.84GJ +0.84GJ
duration
Activation time / duration
49.19s +4.19s
cpu
CPU usage
56.15tf -3.85tf
miningCritBonusYield
Critical Success Bonus Yield
204.31% +4.31%
miningCritChance
Critical Success Chance
0.91% -0.1%
miningAmount
Mining amount
143.9m3 +23.9m3
maxRange
Optimal Range
16530m +1530m
power
Powergrid Usage
16.76MW +4.76MW
miningWasteProbability
Residue Probability
30.92% -3.08%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.142x +0.142
effectiveMiningSpeed
Effective Mining Speed
2.98m³/s +0.26m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.75GJ +4.75GJ
duration
Activation time / duration
49s +4s
cpu
CPU usage
61.4tf +1.4tf
miningCritBonusYield
Critical Success Bonus Yield
198.15% -1.85%
miningCritChance
Critical Success Chance
0.82% -0.18%
miningAmount
Mining amount
107.13m3 -12.87m3
maxRange
Optimal Range
13931.25m -1068.75m
power
Powergrid Usage
16.13MW +4.13MW
miningWasteProbability
Residue Probability
41.69% +7.69%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.886x -0.114
effectiveMiningSpeed
Effective Mining Speed
2.22m³/s -0.5m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
21.38GJ -8.62GJ
duration
Activation time / duration
43.06s -1.94s
cpu
CPU usage
67.28tf +7.28tf
miningCritBonusYield
Critical Success Bonus Yield
190.31% -9.69%
miningCritChance
Critical Success Chance
0.66% -0.34%
miningAmount
Mining amount
122.41m3 +2.41m3
maxRange
Optimal Range
12957.75m -2042.25m
power
Powergrid Usage
10.17MW -1.83MW
miningWasteProbability
Residue Probability
33.06% -0.94%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.035x +0.035
effectiveMiningSpeed
Effective Mining Speed
2.88m³/s +0.16m³/s
+4
56 million ISK est. 64 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
30.67GJ +0.67GJ
duration
Activation time / duration
44.79s -0.21s
cpu
CPU usage
69.46tf +9.46tf
miningCritBonusYield
Critical Success Bonus Yield
181.56% -18.44%
miningCritChance
Critical Success Chance
0.95% -0.05%
miningAmount
Mining amount
103.03m3 -16.97m3
maxRange
Optimal Range
13527m -1473m
power
Powergrid Usage
13.96MW +1.96MW
miningWasteProbability
Residue Probability
43.32% +9.32%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.121x +0.121
effectiveMiningSpeed
Effective Mining Speed
2.34m³/s -0.38m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
40.15GJ +10.15GJ
duration
Activation time / duration
48.58s +3.58s
cpu
CPU usage
70.51tf +10.51tf
miningCritBonusYield
Critical Success Bonus Yield
185.69% -14.31%
miningCritChance
Critical Success Chance
1.13% +0.13%
miningAmount
Mining amount
155.08m3 +35.08m3
maxRange
Optimal Range
14310.75m -689.25m
power
Powergrid Usage
14.72MW +2.72MW
miningWasteProbability
Residue Probability
42.51% +8.51%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.012x +0.012
effectiveMiningSpeed
Effective Mining Speed
3.26m³/s +0.54m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.67GJ -5.33GJ
duration
Activation time / duration
44.12s -0.88s
cpu
CPU usage
68.41tf +8.41tf
miningCritBonusYield
Critical Success Bonus Yield
214.25% +14.25%
miningCritChance
Critical Success Chance
0.74% -0.26%
miningAmount
Mining amount
137.26m3 +17.26m3
maxRange
Optimal Range
12702m -2298m
power
Powergrid Usage
11.56MW -0.44MW
miningWasteProbability
Residue Probability
44.08% +10.08%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.083x +0.083
effectiveMiningSpeed
Effective Mining Speed
3.16m³/s +0.44m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Decayed Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.83GJ -3.17GJ
duration
Activation time / duration
45.24s +0.24s
cpu
CPU usage
65.62tf +5.62tf
miningCritBonusYield
Critical Success Bonus Yield
209.46% +9.46%
miningCritChance
Critical Success Chance
1.08% +0.08%
miningAmount
Mining amount
126.8m3 +6.8m3
maxRange
Optimal Range
16330.5m +1330.5m
power
Powergrid Usage
11.52MW -0.48MW
miningWasteProbability
Residue Probability
33.51% -0.49%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.994x -0.006
effectiveMiningSpeed
Effective Mining Speed
2.87m³/s +0.15m³/s
30 million ISK est. 44 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
38.76GJ +8.76GJ
duration
Activation time / duration
44.73s -0.27s
cpu
CPU usage
57.87tf -2.13tf
miningCritBonusYield
Critical Success Bonus Yield
167.49% -32.51%
miningCritChance
Critical Success Chance
0.66% -0.34%
miningAmount
Mining amount
124.52m3 +4.52m3
maxRange
Optimal Range
11530.5m -3469.5m
power
Powergrid Usage
17.04MW +5.04MW
miningWasteProbability
Residue Probability
31.59% -2.41%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.935x -0.065
effectiveMiningSpeed
Effective Mining Speed
2.81m³/s +0.1m³/s
+4
56 million ISK est. 38 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.21GJ -3.79GJ
duration
Activation time / duration
48.34s +3.34s
cpu
CPU usage
79.04tf +19.04tf
miningCritBonusYield
Critical Success Bonus Yield
191.64% -8.36%
miningCritChance
Critical Success Chance
1.23% +0.23%
miningAmount
Mining amount
132.08m3 +12.08m3
maxRange
Optimal Range
17033.25m +2033.25m
power
Powergrid Usage
17.9MW +5.9MW
miningWasteProbability
Residue Probability
34.57% +0.57%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.03x +0.03
effectiveMiningSpeed
Effective Mining Speed
2.8m³/s +0.08m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.85GJ +1.85GJ
duration
Activation time / duration
48.8s +3.8s
cpu
CPU usage
76.39tf +16.39tf
miningCritBonusYield
Critical Success Bonus Yield
183.31% -16.69%
miningCritChance
Critical Success Chance
0.76% -0.24%
miningAmount
Mining amount
152.11m3 +32.11m3
maxRange
Optimal Range
14929.5m -70.5m
power
Powergrid Usage
10.94MW -1.06MW
miningWasteProbability
Residue Probability
26.51% -7.49%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.98x -0.02
effectiveMiningSpeed
Effective Mining Speed
3.16m³/s +0.44m³/s
Pieance
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
41.54GJ +11.54GJ
duration
Activation time / duration
41.09s -3.92s
cpu
CPU usage
56.53tf -3.47tf
miningCritBonusYield
Critical Success Bonus Yield
206.2% +6.2%
miningCritChance
Critical Success Chance
1.22% +0.22%
miningAmount
Mining amount
112.64m3 -7.36m3
maxRange
Optimal Range
16299m +1299m
power
Powergrid Usage
14.76MW +2.76MW
miningWasteProbability
Residue Probability
31.51% -2.49%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.984x -0.016
effectiveMiningSpeed
Effective Mining Speed
2.81m³/s +0.09m³/s
Pieance
Display:
Attribute Bars:
Page 15