Activation Cost
49.01GJ+4.01GJ
CPU usage
10.49tf+0.49tf
Neutralization Amount
53.78GJ+3.78GJ
Optimal Range
4590.45m+90.45m
Powergrid Usage
7.86MW-0.14MW
est. 2.5 million ISK Created by WSSN Contractor
Created byWSSN Contractor
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.



