Abyssal Strip MinerStrip Miner I Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
16.19GJ-6.81GJ
duration
Activation time / duration
49.06s+4.06s
cpu
CPU usage
51.07tf-8.93tf
miningCritBonusYield
Critical Success Bonus Yield
197.17%-2.83%
miningCritChance
Critical Success Chance
1.02%+0.02%
miningAmount
Mining amount
192.1m3+42.1m3
maxRange
Optimal Range
16587.75m+1587.75m
power
Powergrid Usage
8.69MW-1.31MW
effectiveMiningSpeed
Effective Mining Speed
4m³/s+0.59m³/s
+6
100 million ISKest. 129 million ISK

AI value prediction

Evaluated 5 hours ago

ConfidenceVery lowR² -0.08
Bias scoreVery high798 samples
Avg. error (MAE)±332Mthe lower, the better
Last trained6 days ago
Training data
Tech I278Faction520
View historic sales
Strip Miner I
0
-6.81GJ
+4.06s
-8.93tf
-2.83%
+0.02%
+42.1m3
+1587.75m
-1.31MW
+0.59m³/s
3M
ORE Strip Miner
6
-6.81GJ
+4.06s
+1.07tf
-2.83%
+0.02%
-7.9m3
-2162.25m
-1.31MW
-0.54m³/s
194M