Abyssal Modulated Deep Core Strip MinerModulated Deep Core Strip Miner II Unstable Modulated Deep Core Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
29.57GJ+6.57GJ
duration
Activation time / duration
43.36s-1.64s
cpu
CPU usage
74.42tf+14.42tf
miningCritBonusYield
Critical Success Bonus Yield
201.3%+1.3%
miningCritChance
Critical Success Chance
0.65%-0.35%
miningAmount
Mining amount
90.43m3+10.43m3
maxRange
Optimal Range
19005m+4005m
power
Powergrid Usage
15.86MW+3.86MW
miningWasteProbability
Residue Probability
28.98%-5.02%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.999x-0.001
effectiveMiningSpeed
Effective Mining Speed
2.11m³/s+0.3m³/s
35 million ISKest. 41 million ISK

AI value prediction

Evaluated 8 days ago

ConfidenceVery lowR² -1.06
Bias scoreVery low141 samples
Avg. error (MAE)±58Mthe lower, the better
Last trained1 day ago
Training data
Tech II141
View historic sales
Modulated Deep Core Strip Miner II
5
+6.57GJ
-1.64s
+14.42tf
+1.3%
-0.35%
+10.43m3
+4005m
+3.86MW
-5.02%
-0.001
+0.3m³/s
5M