Activation Cost
20.68GJ-2.32GJ
Activation time / duration
45.7s+0.7s
CPU usage
87.44tf+27.44tf
Critical Success Bonus Yield
214.04%+14.04%
Critical Success Chance
1.09%+0.09%
Mining amount
75.38m3-4.62m3
Optimal Range
12594.75m-2405.25m
Powergrid Usage
15.74MW+3.74MW
Residue Probability
26.86%-7.14%
Residue Volume Multiplier
0.91x-0.09
Effective Mining Speed
1.69m³/s-0.13m³/s
est. 39 million ISK
AI value prediction
Evaluated 14 hours ago
ConfidenceVery lowR² -0.87
Bias scoreVery low144 samples
Avg. error (MAE)±58Mthe lower, the better
Last trained2 days ago









