Abyssal Ice Mining LaserIce Mining Laser II Gravid Ice Mining Laser Mutaplasmid
capacitorNeed
Activation Cost
13.12GJ-1.88GJ
duration
Activation time / duration
294.38s-5.63s
cpu
CPU usage
53.02tf-6.97tf
miningCritBonusYield
Critical Success Bonus Yield
179.25%-20.75%
miningCritChance
Critical Success Chance
0.76%-0.24%
miningAmount
Mining amount
1120.8m3+120.8m3
maxRange
Optimal Range
7699.6m-300.4m
power
Powergrid Usage
6.42MW+0.41MW
miningWasteProbability
Residue Probability
29.96%-4.04%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.095x+0.095
effectiveMiningSpeed
Effective Mining Speed
3.86m³/s+0.46m³/s
25 million ISKest. 60 million ISK
Junk Trunk Punk
Created byJunk Trunk Punk

AI Value prediction

These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.

Search options

Export options

Miscellaneous

Download image
Ice Mining Laser I
+3.12GJ-65.63s+3.02tf-20.75%-0.24%+120.8m3+699.6m+1.42MW+29.96%+1.095+1.03m³/s539 thousand
Ice Mining Laser II
-1.88GJ-5.63s-6.97tf-20.75%-0.24%+120.8m3-300.4m+0.41MW-4.04%+0.095+0.46m³/s1.3 million
ORE Ice Mining Laser
-1.88GJ-5.63s-6.97tf-20.75%-0.24%+120.8m3-3300.4m+0.41MW+29.96%+1.095+0.46m³/s57 million
230599908
Junk Trunk PunkJunk Trunk Punk
2026-04-15 05:4717 days ago
2026-05-13 05:47in 11 days
No
25 million

Similar Modules Sold

Modules with the most similar attributes that have sold in the past.

Premium Feature

Unlock similar sold modules to see what comparable items have sold for in the past.

Upgrade to Premium