Activation Cost
12.92GJ+0.92GJ
Activation time / duration
201.32s+1.32s
CPU usage
83.48tf+17.48tf
Critical Success Bonus Yield
203.05%+3.05%
Critical Success Chance
1.29%+0.29%
Mining amount
947.2m3-52.8m3
Optimal Range
8638.5m-1361.5m
Powergrid Usage
14MW+4MW
Residue Probability
38.55%+4.55%
Residue Volume Multiplier
0.84x-0.16
Effective Mining Speed
4.83m³/s-0.27m³/s
60 million ISKest. 85 million ISK
Created byLuka 1992
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
232852478 | 2026-06-14 14:184 hours ago | 2026-07-12 14:18in 28 days | No | 60 million |
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.



