Abyssal Gas Cloud HarvesterGas Cloud Harvester II Unstable Gas Cloud Harvester Mutaplasmid
capacitorNeed
Activation Cost
8.75GJ-1.25GJ
duration
Activation time / duration
74.24s-5.76s
cpu
CPU usage
63.15tf-2.85tf
miningAmount
Mining amount
120.1m3+20.1m3
maxRange
Optimal Range
1221.53m-278.48m
power
Powergrid Usage
10.02MW+0.02MW
miningWasteProbability
Residue Probability
36.24%+2.24%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.031x+0.031
miningSpeed
Mining Speed
1.62m³/s+0.37m³/s
Altalar Maaktal
est. 90 million ISK

AI value prediction

Evaluated 7 days ago

ConfidenceModerateR² 0.55
Bias scoreModerate390 samples
Avg. error (MAE)±24Mthe lower, the better
Last trained2 days ago
Training data
Tech I6Faction36Tech II348
View historic sales
Gas Cloud Harvester I
0
+1.75GJ
-25.76s
+3.15tf
+70.1m3
-278.48m
+0.02MW
+36.24%
+1.031
+1.12m³/s
3M
Gas Cloud Harvester II
0
-1.25GJ
-5.76s
-2.85tf
+20.1m3
-278.48m
+0.02MW
+2.24%
+0.031
+0.37m³/s
6M
ORE Gas Cloud Harvester
6
+1.75GJ
-5.76s
+13.15tf
+20.1m3
-278.48m
+0.02MW
+36.24%
+1.031
+0.37m³/s
206M