Activation Cost
344.06GJ+24.06GJ
CPU usage
39.49tf-3.51tf
Maximum Velocity Bonus
128.95%+3.95%
Powergrid Usage
451.58MW-111.42MW
est. 807 million ISK Created by Oraval Dosloe
Created byOraval Dosloe
AI Value prediction
These models can be very inaccurate, so always do your own research by looking for similar modules on contracts.
Search options
Export options
Miscellaneous
| No results. | |||||||
Similar Modules Sold
Modules with the most similar attributes that have sold in the past.
Premium Feature
Unlock similar sold modules to see what comparable items have sold for in the past.



