Category

Meta Group

Meta Level

Miscellaneous

Availability

T1-PRODUCTION-9-2
Modules owned by

T1-PRODUCTION-9-2

Estimated value

ISK
1M
ISK
100B
1M
10M
100M
1B
10B
100B
1M
100B
Sort
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
9.37GJ-2.63GJ
duration
Activation time / duration
191.52s-8.48s
cpu
CPU usage
61.07tf-4.93tf
miningCritBonusYield
Critical Success Bonus Yield
185.41%-14.59%
miningCritChance
Critical Success Chance
0.87%-0.13%
miningAmount
Mining amount
1057.9m3+57.9m3
maxRange
Optimal Range
11289.5m+1289.5m
power
Powergrid Usage
11.79MW+1.79MW
miningWasteProbability
Residue Probability
29.68%-4.33%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.806x-0.194
effectiveMiningSpeed
Effective Mining Speed
5.61m³/s+0.51m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
8.58GJ-3.42GJ
duration
Activation time / duration
187.96s-12.04s
cpu
CPU usage
73.31tf+7.31tf
miningCritBonusYield
Critical Success Bonus Yield
208.79%+8.79%
miningCritChance
Critical Success Chance
1.29%+0.29%
miningAmount
Mining amount
1182.55m3+182.55m3
maxRange
Optimal Range
12279.5m+2279.5m
power
Powergrid Usage
8.18MW-1.82MW
miningWasteProbability
Residue Probability
33.63%-0.37%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.82x-0.18
effectiveMiningSpeed
Effective Mining Speed
6.46m³/s+1.36m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
10.46GJ-1.54GJ
duration
Activation time / duration
185.96s-14.04s
cpu
CPU usage
67.72tf+1.72tf
miningCritBonusYield
Critical Success Bonus Yield
167.07%-32.93%
miningCritChance
Critical Success Chance
0.79%-0.21%
miningAmount
Mining amount
1048.9m3+48.9m3
maxRange
Optimal Range
12318m+2318m
power
Powergrid Usage
9.41MW-0.59MW
miningWasteProbability
Residue Probability
24.86%-9.14%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.994x-0.006
effectiveMiningSpeed
Effective Mining Speed
5.71m³/s+0.61m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
16.64GJ+4.64GJ
duration
Activation time / duration
193.44s-6.56s
cpu
CPU usage
65.92tf-0.08tf
miningCritBonusYield
Critical Success Bonus Yield
178.83%-21.17%
miningCritChance
Critical Success Chance
1.23%+0.23%
miningAmount
Mining amount
1244.65m3+244.65m3
maxRange
Optimal Range
9727.5m-272.5m
power
Powergrid Usage
9.94MW-0.06MW
miningWasteProbability
Residue Probability
28.08%-5.92%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.018x+0.018
effectiveMiningSpeed
Effective Mining Speed
6.58m³/s+1.48m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
11.63GJ-0.37GJ
duration
Activation time / duration
189.28s-10.72s
cpu
CPU usage
57.65tf-8.35tf
miningCritBonusYield
Critical Success Bonus Yield
169.38%-30.62%
miningCritChance
Critical Success Chance
0.85%-0.15%
miningAmount
Mining amount
1164.55m3+164.55m3
maxRange
Optimal Range
11289.5m+1289.5m
power
Powergrid Usage
10.77MW+0.77MW
miningWasteProbability
Residue Probability
29.74%-4.26%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.975x-0.025
effectiveMiningSpeed
Effective Mining Speed
6.24m³/s+1.14m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
16.47GJ+4.47GJ
duration
Activation time / duration
193.52s-6.48s
cpu
CPU usage
91.19tf+25.19tf
miningCritBonusYield
Critical Success Bonus Yield
180.79%-19.21%
miningCritChance
Critical Success Chance
1.18%+0.18%
miningAmount
Mining amount
1140.7m3+140.7m3
maxRange
Optimal Range
11394m+1394m
power
Powergrid Usage
9.67MW-0.33MW
miningWasteProbability
Residue Probability
35.98%+1.98%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.813x-0.187
effectiveMiningSpeed
Effective Mining Speed
6.02m³/s+0.92m³/s
650 million ISKNo estimate available
Abyssal Strip MinerStrip Miner I Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
23.83GJ+0.83GJ
duration
Activation time / duration
44.14s-0.86s
cpu
CPU usage
49.05tf-10.95tf
miningCritBonusYield
Critical Success Bonus Yield
184.15%-15.85%
miningCritChance
Critical Success Chance
1.03%+0.03%
miningAmount
Mining amount
193.45m3+43.45m3
maxRange
Optimal Range
13964.25m-1035.75m
power
Powergrid Usage
14.71MW+4.71MW
effectiveMiningSpeed
Effective Mining Speed
4.47m³/s+1.07m³/s
650 million ISKNo estimate available
Abyssal Strip MinerStrip Miner I Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.92GJ+3.92GJ
duration
Activation time / duration
43.57s-1.43s
cpu
CPU usage
74.71tf+14.71tf
miningCritBonusYield
Critical Success Bonus Yield
215.09%+15.09%
miningCritChance
Critical Success Chance
1.15%+0.14%
miningAmount
Mining amount
171.58m3+21.58m3
maxRange
Optimal Range
11398.5m-3601.5m
power
Powergrid Usage
8.61MW-1.39MW
effectiveMiningSpeed
Effective Mining Speed
4.04m³/s+0.64m³/s
650 million ISKNo estimate available
Abyssal Strip MinerStrip Miner I Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
18.38GJ-4.62GJ
duration
Activation time / duration
43.73s-1.27s
cpu
CPU usage
80tf+20tf
miningCritBonusYield
Critical Success Bonus Yield
198.22%-1.78%
miningCritChance
Critical Success Chance
0.78%-0.22%
miningAmount
Mining amount
170.7m3+20.7m3
maxRange
Optimal Range
12479.25m-2520.75m
power
Powergrid Usage
13.5MW+3.5MW
effectiveMiningSpeed
Effective Mining Speed
3.96m³/s+0.56m³/s
650 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
38.1GJ+8.1GJ
duration
Activation time / duration
44.85s-0.15s
cpu
CPU usage
75.92tf+15.92tf
miningCritBonusYield
Critical Success Bonus Yield
210.65%+10.65%
miningCritChance
Critical Success Chance
1.2%+0.2%
miningAmount
Mining amount
121m3+1m3
maxRange
Optimal Range
15381.75m+381.75m
power
Powergrid Usage
15.23MW+3.23MW
miningWasteProbability
Residue Probability
39.83%+5.83%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.948x-0.052
effectiveMiningSpeed
Effective Mining Speed
2.77m³/s+0.05m³/s
385 million ISKNo estimate available