Category

Meta Group

Meta Level

Miscellaneous

Availability

T1-PRODUCTION-8-2
Modules owned by

T1-PRODUCTION-8-2

Estimated value

ISK
1M
ISK
100B
1M
10M
100M
1B
10B
100B
1M
100B
Sort
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
14.89GJ+2.89GJ
duration
Activation time / duration
190.64s-9.36s
cpu
CPU usage
78.72tf+12.72tf
miningCritBonusYield
Critical Success Bonus Yield
219.43%+19.43%
miningCritChance
Critical Success Chance
0.78%-0.22%
miningAmount
Mining amount
1041.7m3+41.7m3
maxRange
Optimal Range
10123.5m+123.5m
power
Powergrid Usage
11.61MW+1.61MW
miningWasteProbability
Residue Probability
42.24%+8.24%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.081x+0.081
effectiveMiningSpeed
Effective Mining Speed
5.56m³/s+0.46m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
7.73GJ-4.27GJ
duration
Activation time / duration
182.64s-17.36s
cpu
CPU usage
73.13tf+7.13tf
miningCritBonusYield
Critical Success Bonus Yield
213.48%+13.48%
miningCritChance
Critical Success Chance
0.76%-0.24%
miningAmount
Mining amount
1235.2m3+235.2m3
maxRange
Optimal Range
12175m+2175m
power
Powergrid Usage
11.7MW+1.7MW
miningWasteProbability
Residue Probability
39.43%+5.43%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.973x-0.027
effectiveMiningSpeed
Effective Mining Speed
6.87m³/s+1.77m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
16.62GJ+4.62GJ
duration
Activation time / duration
195.84s-4.16s
cpu
CPU usage
77.7tf+11.7tf
miningCritBonusYield
Critical Success Bonus Yield
200.18%+0.18%
miningCritChance
Critical Success Chance
1.21%+0.21%
miningAmount
Mining amount
1224.4m3+224.4m3
maxRange
Optimal Range
10079.5m+79.5m
power
Powergrid Usage
11.2MW+1.2MW
miningWasteProbability
Residue Probability
29.04%-4.96%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.966x-0.034
effectiveMiningSpeed
Effective Mining Speed
6.4m³/s+1.3m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
16.12GJ+4.12GJ
duration
Activation time / duration
182.36s-17.64s
cpu
CPU usage
90.04tf+24.04tf
miningCritBonusYield
Critical Success Bonus Yield
175.12%-24.88%
miningCritChance
Critical Success Chance
0.87%-0.13%
miningAmount
Mining amount
1046.65m3+46.65m3
maxRange
Optimal Range
8545m-1455m
power
Powergrid Usage
10.82MW+0.82MW
miningWasteProbability
Residue Probability
32.49%-1.51%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.811x-0.189
effectiveMiningSpeed
Effective Mining Speed
5.83m³/s+0.73m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
11.61GJ-0.39GJ
duration
Activation time / duration
187.56s-12.44s
cpu
CPU usage
89.9tf+23.9tf
miningCritBonusYield
Critical Success Bonus Yield
174.42%-25.58%
miningCritChance
Critical Success Chance
1.15%+0.14%
miningAmount
Mining amount
1225.3m3+225.3m3
maxRange
Optimal Range
9898m-102m
power
Powergrid Usage
13.65MW+3.65MW
miningWasteProbability
Residue Probability
32.84%-1.16%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.131x+0.131
effectiveMiningSpeed
Effective Mining Speed
6.66m³/s+1.56m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
10.35GJ-1.65GJ
duration
Activation time / duration
190.04s-9.96s
cpu
CPU usage
83.43tf+17.43tf
miningCritBonusYield
Critical Success Bonus Yield
174.07%-25.93%
miningCritChance
Critical Success Chance
0.7%-0.3%
miningAmount
Mining amount
1187.95m3+187.95m3
maxRange
Optimal Range
8303m-1697m
power
Powergrid Usage
11.39MW+1.39MW
miningWasteProbability
Residue Probability
31.39%-2.61%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.133x+0.133
effectiveMiningSpeed
Effective Mining Speed
6.33m³/s+1.23m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
9.7GJ-2.3GJ
duration
Activation time / duration
181.2s-18.8s
cpu
CPU usage
95.86tf+29.86tf
miningCritBonusYield
Critical Success Bonus Yield
227.41%+27.41%
miningCritChance
Critical Success Chance
0.77%-0.23%
miningAmount
Mining amount
1299.1m3+299.1m3
maxRange
Optimal Range
11146.5m+1146.5m
power
Powergrid Usage
11.16MW+1.16MW
miningWasteProbability
Residue Probability
41.22%+7.22%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.973x-0.027
effectiveMiningSpeed
Effective Mining Speed
7.29m³/s+2.19m³/s
650 million ISKNo estimate available
Abyssal Strip MinerStrip Miner I Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
16.61GJ-6.38GJ
duration
Activation time / duration
44.38s-0.62s
cpu
CPU usage
78.66tf+18.66tf
miningCritBonusYield
Critical Success Bonus Yield
205.78%+5.78%
miningCritChance
Critical Success Chance
0.72%-0.28%
miningAmount
Mining amount
159.29m3+9.29m3
maxRange
Optimal Range
16340.25m+1340.25m
power
Powergrid Usage
11.28MW+1.28MW
effectiveMiningSpeed
Effective Mining Speed
3.64m³/s+0.24m³/s
650 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
36.05GJ+6.04GJ
duration
Activation time / duration
44.41s-0.58s
cpu
CPU usage
60.23tf+0.23tf
miningCritBonusYield
Critical Success Bonus Yield
198.2%-1.8%
miningCritChance
Critical Success Chance
1.08%+0.08%
miningAmount
Mining amount
139.32m3+19.32m3
maxRange
Optimal Range
15017.25m+17.25m
power
Powergrid Usage
11.33MW-0.67MW
miningWasteProbability
Residue Probability
36.99%+2.99%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.938x-0.062
effectiveMiningSpeed
Effective Mining Speed
3.2m³/s+0.48m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
38.35GJ+8.36GJ
duration
Activation time / duration
44.13s-0.87s
cpu
CPU usage
53.08tf-6.92tf
miningCritBonusYield
Critical Success Bonus Yield
217%+17%
miningCritChance
Critical Success Chance
1%0%
miningAmount
Mining amount
124.92m3+4.92m3
maxRange
Optimal Range
13674m-1326m
power
Powergrid Usage
11.82MW-0.18MW
miningWasteProbability
Residue Probability
28.95%-5.05%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.972x-0.028
effectiveMiningSpeed
Effective Mining Speed
2.89m³/s+0.17m³/s
385 million ISKNo estimate available