Category

Meta Group

Meta Level

Miscellaneous

Availability

T1-PRODUCTION-8-1
Modules owned by

T1-PRODUCTION-8-1

Estimated value

ISK
1M
ISK
100B
1M
10M
100M
1B
10B
100B
1M
100B
Sort
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
9.08GJ-2.92GJ
duration
Activation time / duration
194.92s-5.08s
cpu
CPU usage
80.84tf+14.84tf
miningCritBonusYield
Critical Success Bonus Yield
199.41%-0.59%
miningCritChance
Critical Success Chance
1.08%+0.08%
miningAmount
Mining amount
1194.7m3+194.7m3
maxRange
Optimal Range
12488.5m+2488.5m
power
Powergrid Usage
13.03MW+3.03MW
miningWasteProbability
Residue Probability
43.36%+9.36%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.849x-0.151
effectiveMiningSpeed
Effective Mining Speed
6.26m³/s+1.16m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
12.22GJ+0.22GJ
duration
Activation time / duration
182.6s-17.4s
cpu
CPU usage
83.71tf+17.71tf
miningCritBonusYield
Critical Success Bonus Yield
160.42%-39.58%
miningCritChance
Critical Success Chance
1.3%+0.3%
miningAmount
Mining amount
1179.85m3+179.85m3
maxRange
Optimal Range
9942m-58m
power
Powergrid Usage
13.39MW+3.39MW
miningWasteProbability
Residue Probability
30.47%-3.53%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.893x-0.107
effectiveMiningSpeed
Effective Mining Speed
6.6m³/s+1.5m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
13.52GJ+1.52GJ
duration
Activation time / duration
193.92s-6.08s
cpu
CPU usage
63.38tf-2.62tf
miningCritBonusYield
Critical Success Bonus Yield
178.97%-21.03%
miningCritChance
Critical Success Chance
0.73%-0.27%
miningAmount
Mining amount
1186.15m3+186.15m3
maxRange
Optimal Range
10068.5m+68.5m
power
Powergrid Usage
9.58MW-0.42MW
miningWasteProbability
Residue Probability
32.8%-1.2%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.101x+0.101
effectiveMiningSpeed
Effective Mining Speed
6.2m³/s+1.1m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
11.88GJ-0.12GJ
duration
Activation time / duration
191.72s-8.28s
cpu
CPU usage
76.69tf+10.69tf
miningCritBonusYield
Critical Success Bonus Yield
208.86%+8.86%
miningCritChance
Critical Success Chance
0.98%-0.02%
miningAmount
Mining amount
1124.05m3+124.05m3
maxRange
Optimal Range
10657m+657m
power
Powergrid Usage
10.48MW+0.48MW
miningWasteProbability
Residue Probability
36.86%+2.86%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.978x-0.022
effectiveMiningSpeed
Effective Mining Speed
5.98m³/s+0.88m³/s
650 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
8.08GJ-3.92GJ
duration
Activation time / duration
195.6s-4.4s
cpu
CPU usage
73.13tf+7.13tf
miningCritBonusYield
Critical Success Bonus Yield
227.69%+27.69%
miningCritChance
Critical Success Chance
1.07%+0.07%
miningAmount
Mining amount
1053.85m3+53.85m3
maxRange
Optimal Range
11460m+1460m
power
Powergrid Usage
9.14MW-0.86MW
miningWasteProbability
Residue Probability
37.08%+3.08%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.897x-0.103
effectiveMiningSpeed
Effective Mining Speed
5.52m³/s+0.42m³/s
650 million ISKNo estimate available
Abyssal Strip MinerStrip Miner I Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.18GJ+1.18GJ
duration
Activation time / duration
41.43s-3.57s
cpu
CPU usage
73.66tf+13.66tf
miningCritBonusYield
Critical Success Bonus Yield
166.44%-33.56%
miningCritChance
Critical Success Chance
0.79%-0.21%
miningAmount
Mining amount
184.54m3+34.54m3
maxRange
Optimal Range
14616m-384m
power
Powergrid Usage
14.91MW+4.91MW
effectiveMiningSpeed
Effective Mining Speed
4.51m³/s+1.11m³/s
650 million ISKNo estimate available
Abyssal Strip MinerStrip Miner I Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
14.78GJ-8.22GJ
duration
Activation time / duration
45.32s+0.32s
cpu
CPU usage
83.99tf+23.99tf
miningCritBonusYield
Critical Success Bonus Yield
199.83%-0.17%
miningCritChance
Critical Success Chance
1.06%+0.06%
miningAmount
Mining amount
166.85m3+16.85m3
maxRange
Optimal Range
16068m+1068m
power
Powergrid Usage
8.11MW-1.9MW
effectiveMiningSpeed
Effective Mining Speed
3.76m³/s+0.36m³/s
650 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
36.1GJ+6.11GJ
duration
Activation time / duration
43.5s-1.5s
cpu
CPU usage
59.61tf-0.39tf
miningCritBonusYield
Critical Success Bonus Yield
173.3%-26.7%
miningCritChance
Critical Success Chance
1.08%+0.08%
miningAmount
Mining amount
124.81m3+4.81m3
maxRange
Optimal Range
12432m-2568m
power
Powergrid Usage
13.12MW+1.12MW
miningWasteProbability
Residue Probability
30.07%-3.93%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.967x-0.033
effectiveMiningSpeed
Effective Mining Speed
2.92m³/s+0.2m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
25.08GJ-4.92GJ
duration
Activation time / duration
43.67s-1.33s
cpu
CPU usage
62.61tf+2.61tf
miningCritBonusYield
Critical Success Bonus Yield
200.1%+0.1%
miningCritChance
Critical Success Chance
0.88%-0.12%
miningAmount
Mining amount
137.81m3+17.81m3
maxRange
Optimal Range
18453m+3453m
power
Powergrid Usage
13.2MW+1.2MW
miningWasteProbability
Residue Probability
34.52%+0.52%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.99x-0.01
effectiveMiningSpeed
Effective Mining Speed
3.21m³/s+0.49m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.42GJ-2.58GJ
duration
Activation time / duration
45.29s+0.29s
cpu
CPU usage
51.11tf-8.89tf
miningCritBonusYield
Critical Success Bonus Yield
208.7%+8.7%
miningCritChance
Critical Success Chance
1.11%+0.11%
miningAmount
Mining amount
127.58m3+7.58m3
maxRange
Optimal Range
15381.75m+381.75m
power
Powergrid Usage
14.9MW+2.9MW
miningWasteProbability
Residue Probability
38.26%+4.26%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.959x-0.041
effectiveMiningSpeed
Effective Mining Speed
2.88m³/s+0.16m³/s
385 million ISKNo estimate available