Category

Meta Group

Meta Level

Miscellaneous

Availability

T1-PRODUCTION-5-2
Modules owned by

T1-PRODUCTION-5-2

Estimated value

ISK
1M
ISK
100B
1M
10M
100M
1B
10B
100B
1M
100B
Sort
Abyssal Ice Mining LaserIce Mining Laser II Unstable Ice Mining Laser Mutaplasmid
capacitorNeed
Activation Cost
17.52GJ+2.52GJ
duration
Activation time / duration
279.54s-20.46s
cpu
CPU usage
86.89tf+26.89tf
miningCritBonusYield
Critical Success Bonus Yield
196.33%-3.67%
miningCritChance
Critical Success Chance
1.24%+0.24%
miningAmount
Mining amount
1277.5m3+277.5m3
maxRange
Optimal Range
7931.6m-68.4m
power
Powergrid Usage
8.99MW+2.99MW
miningWasteProbability
Residue Probability
43.65%+9.65%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.989x-0.011
effectiveMiningSpeed
Effective Mining Speed
4.68m³/s+1.28m³/s
185 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
33.18GJ+3.18GJ
duration
Activation time / duration
42.97s-2.03s
cpu
CPU usage
70.22tf+10.22tf
miningCritBonusYield
Critical Success Bonus Yield
206.5%+6.5%
miningCritChance
Critical Success Chance
0.76%-0.24%
miningAmount
Mining amount
126.65m3+6.65m3
maxRange
Optimal Range
12270m-2730m
power
Powergrid Usage
14.29MW+2.29MW
miningWasteProbability
Residue Probability
37.92%+3.92%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.061x+0.061
effectiveMiningSpeed
Effective Mining Speed
2.99m³/s+0.27m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
29.77GJ-0.23GJ
duration
Activation time / duration
43.67s-1.33s
cpu
CPU usage
58.83tf-1.17tf
miningCritBonusYield
Critical Success Bonus Yield
172.2%-27.8%
miningCritChance
Critical Success Chance
1.14%+0.14%
miningAmount
Mining amount
138.96m3+18.96m3
maxRange
Optimal Range
17460.75m+2460.75m
power
Powergrid Usage
15.31MW+3.31MW
miningWasteProbability
Residue Probability
40.77%+6.77%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.883x-0.117
effectiveMiningSpeed
Effective Mining Speed
3.24m³/s+0.52m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.27GJ+5.26GJ
duration
Activation time / duration
44.61s-0.39s
cpu
CPU usage
56.75tf-3.25tf
miningCritBonusYield
Critical Success Bonus Yield
208.65%+8.65%
miningCritChance
Critical Success Chance
0.77%-0.23%
miningAmount
Mining amount
125.64m3+5.64m3
maxRange
Optimal Range
14328.75m-671.25m
power
Powergrid Usage
12.21MW+0.21MW
miningWasteProbability
Residue Probability
39.55%+5.55%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.905x-0.095
effectiveMiningSpeed
Effective Mining Speed
2.86m³/s+0.14m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
33.39GJ+3.39GJ
duration
Activation time / duration
44.18s-0.82s
cpu
CPU usage
61.53tf+1.53tf
miningCritBonusYield
Critical Success Bonus Yield
211.65%+11.65%
miningCritChance
Critical Success Chance
1.18%+0.18%
miningAmount
Mining amount
131.58m3+11.58m3
maxRange
Optimal Range
16860m+1860m
power
Powergrid Usage
14.36MW+2.36MW
miningWasteProbability
Residue Probability
38.12%+4.12%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.095x+0.095
effectiveMiningSpeed
Effective Mining Speed
3.05m³/s+0.33m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
25.89GJ-4.11GJ
duration
Activation time / duration
44.07s-0.93s
cpu
CPU usage
71.03tf+11.03tf
miningCritBonusYield
Critical Success Bonus Yield
172.4%-27.6%
miningCritChance
Critical Success Chance
0.89%-0.11%
miningAmount
Mining amount
125.75m3+5.75m3
maxRange
Optimal Range
13154.25m-1845.75m
power
Powergrid Usage
13.55MW+1.55MW
miningWasteProbability
Residue Probability
29.23%-4.77%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.879x-0.121
effectiveMiningSpeed
Effective Mining Speed
2.9m³/s+0.18m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.75GJ-2.25GJ
duration
Activation time / duration
44.39s-0.61s
cpu
CPU usage
61.29tf+1.29tf
miningCritBonusYield
Critical Success Bonus Yield
185.95%-14.05%
miningCritChance
Critical Success Chance
0.82%-0.18%
miningAmount
Mining amount
143.32m3+23.32m3
maxRange
Optimal Range
12756m-2244m
power
Powergrid Usage
12.11MW+0.11MW
miningWasteProbability
Residue Probability
33.78%-0.22%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.927x-0.073
effectiveMiningSpeed
Effective Mining Speed
3.28m³/s+0.56m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.09GJ+1.09GJ
duration
Activation time / duration
43.27s-1.73s
cpu
CPU usage
71.44tf+11.44tf
miningCritBonusYield
Critical Success Bonus Yield
170%-30%
miningCritChance
Critical Success Chance
1.09%+0.09%
miningAmount
Mining amount
126.9m3+6.9m3
maxRange
Optimal Range
12607.5m-2392.5m
power
Powergrid Usage
13.08MW+1.08MW
miningWasteProbability
Residue Probability
34.11%+0.11%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.045x+0.045
effectiveMiningSpeed
Effective Mining Speed
2.99m³/s+0.27m³/s
385 million ISKNo estimate available
Abyssal Modulated Strip MinerModulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.78GJ-2.22GJ
duration
Activation time / duration
44.66s-0.34s
cpu
CPU usage
75.62tf+15.62tf
miningCritBonusYield
Critical Success Bonus Yield
182.5%-17.5%
miningCritChance
Critical Success Chance
0.94%-0.06%
miningAmount
Mining amount
132.01m3+12.01m3
maxRange
Optimal Range
17987.25m+2987.25m
power
Powergrid Usage
14.21MW+2.21MW
miningWasteProbability
Residue Probability
35.18%+1.18%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.874x-0.126
effectiveMiningSpeed
Effective Mining Speed
3.01m³/s+0.29m³/s
385 million ISKNo estimate available