Category

Meta Group

Meta Level

Miscellaneous

Availability

BLACKxDRAGON Ellecon
Modules owned by

BLACKxDRAGON Ellecon

Estimated value

ISK
1M
ISK
100B
1M
10M
100M
1B
10B
100B
1M
100B
Sort
Abyssal Ice HarvesterIce Harvester II Gravid Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
9.92GJ-2.08GJ
duration
Activation time / duration
198.93s-1.07s
cpu
CPU usage
80.87tf+14.87tf
miningCritBonusYield
Critical Success Bonus Yield
208.45%+8.45%
miningCritChance
Critical Success Chance
1.14%+0.14%
miningAmount
Mining amount
1011.3m3+11.3m3
maxRange
Optimal Range
8828m-1172m
power
Powergrid Usage
10.26MW+0.26MW
miningWasteProbability
Residue Probability
31.8%-2.2%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.905x-0.095
effectiveMiningSpeed
Effective Mining Speed
5.21m³/s+0.1m³/s
52 million ISKest. 23 million ISK
Abyssal Ice HarvesterIce Harvester II Gravid Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
10.02GJ-1.98GJ
duration
Activation time / duration
206.63s+6.63s
cpu
CPU usage
57.08tf-8.92tf
miningCritBonusYield
Critical Success Bonus Yield
216.75%+16.75%
miningCritChance
Critical Success Chance
1.1%+0.1%
miningAmount
Mining amount
1041m3+41m3
maxRange
Optimal Range
10034m+34m
power
Powergrid Usage
12.11MW+2.11MW
miningWasteProbability
Residue Probability
28.21%-5.79%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.882x-0.118
effectiveMiningSpeed
Effective Mining Speed
5.16m³/s+0.06m³/s
85 million ISKest. 34 million ISK
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
11.25GJ-0.75GJ
duration
Activation time / duration
198.2s-1.8s
cpu
CPU usage
55.25tf-10.75tf
miningCritBonusYield
Critical Success Bonus Yield
162.1%-37.9%
miningCritChance
Critical Success Chance
1.22%+0.22%
miningAmount
Mining amount
882.85m3-117.15m3
maxRange
Optimal Range
11575.5m+1575.5m
power
Powergrid Usage
11.05MW+1.05MW
miningWasteProbability
Residue Probability
32.69%-1.31%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.107x+0.107
effectiveMiningSpeed
Effective Mining Speed
4.54m³/s-0.56m³/s
+1
65 million ISKest. 47 million ISK
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
11.82GJ-0.18GJ
duration
Activation time / duration
217.24s+17.24s
cpu
CPU usage
78.39tf+12.39tf
miningCritBonusYield
Critical Success Bonus Yield
188.14%-11.86%
miningCritChance
Critical Success Chance
0.82%-0.17%
miningAmount
Mining amount
1193.35m3+193.35m3
maxRange
Optimal Range
10811m+811m
power
Powergrid Usage
11MW+1MW
miningWasteProbability
Residue Probability
26.7%-7.3%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.053x+0.053
effectiveMiningSpeed
Effective Mining Speed
5.58m³/s+0.48m³/s
+1
65 million ISKest. 48 million ISK
Abyssal Ice HarvesterIce Harvester II Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
12.8GJ+0.8GJ
duration
Activation time / duration
182.84s-17.16s
cpu
CPU usage
61.95tf-4.05tf
miningCritBonusYield
Critical Success Bonus Yield
187.23%-12.77%
miningCritChance
Critical Success Chance
1.13%+0.13%
miningAmount
Mining amount
970.6m3-29.4m3
maxRange
Optimal Range
7841m-2159m
power
Powergrid Usage
8.03MW-1.97MW
miningWasteProbability
Residue Probability
32.78%-1.22%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.85x-0.15
effectiveMiningSpeed
Effective Mining Speed
5.42m³/s+0.32m³/s
60 million ISKest. 67 million ISK
Abyssal Ice HarvesterIce Harvester II Gravid Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
12.56GJ+0.56GJ
duration
Activation time / duration
195.25s-4.75s
cpu
CPU usage
78.46tf+12.46tf
miningCritBonusYield
Critical Success Bonus Yield
218.45%+18.45%
miningCritChance
Critical Success Chance
1.04%+0.04%
miningAmount
Mining amount
987m3-13m3
maxRange
Optimal Range
9003.5m-996.5m
power
Powergrid Usage
12.19MW+2.19MW
miningWasteProbability
Residue Probability
33.25%-0.75%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.855x-0.145
effectiveMiningSpeed
Effective Mining Speed
5.17m³/s+0.07m³/s
45 million ISKest. 33 million ISK
Abyssal Ice HarvesterIce Harvester II Gravid Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
15.6GJ+3.6GJ
duration
Activation time / duration
192.6s-7.4s
cpu
CPU usage
77.39tf+11.39tf
miningCritBonusYield
Critical Success Bonus Yield
189.45%-10.55%
miningCritChance
Critical Success Chance
0.99%-0.01%
miningAmount
Mining amount
1025.1m3+25.1m3
maxRange
Optimal Range
8895.5m-1104.5m
power
Powergrid Usage
9.09MW-0.91MW
miningWasteProbability
Residue Probability
28.06%-5.94%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.045x+0.045
effectiveMiningSpeed
Effective Mining Speed
5.42m³/s+0.32m³/s
35 million ISKest. 36 million ISK
Mutated Ice Harvesting DroneIce Harvesting Drone I Exigent Ice Harvesting Drone Mutaplasmid
duration
Activation time / duration
381.6s+21.6s
maxVelocity
Maximum Velocity
205.16m/sec+5.16m/sec
miningAmount
Mining amount
1198.3m3+198.3m3
maxRange
Optimal Range
6277.25m+1277.25m
miningSpeed
Mining Speed
3.14m³/s+0.36m³/s
15 million ISKNo estimate available
Abyssal Ice HarvesterIce Harvester I Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
8.89GJ+0.89GJ
duration
Activation time / duration
220.03s-19.97s
cpu
CPU usage
56.65tf-3.35tf
miningCritBonusYield
Critical Success Bonus Yield
202.56%+2.56%
miningCritChance
Critical Success Chance
0.79%-0.21%
miningAmount
Mining amount
931.9m3-68.1m3
maxRange
Optimal Range
9881.5m-118.5m
power
Powergrid Usage
14.85MW+4.85MW
effectiveMiningSpeed
Effective Mining Speed
4.3m³/s+0.05m³/s
70 million ISKest. 12 million ISK
Abyssal Ice HarvesterIce Harvester I Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
5.99GJ-2.01GJ
duration
Activation time / duration
223.49s-16.51s
cpu
CPU usage
71.6tf+11.6tf
miningCritBonusYield
Critical Success Bonus Yield
206.27%+6.27%
miningCritChance
Critical Success Chance
0.89%-0.11%
miningAmount
Mining amount
1160.05m3+160.05m3
maxRange
Optimal Range
11828.5m+1828.5m
power
Powergrid Usage
12.05MW+2.05MW
effectiveMiningSpeed
Effective Mining Speed
5.29m³/s+1.04m³/s
65 million ISKest. 56 million ISK
Abyssal Ice HarvesterIce Harvester I Unstable Ice Harvester Mutaplasmid
capacitorNeed
Activation Cost
10.18GJ+2.18GJ
duration
Activation time / duration
229.1s-10.9s
cpu
CPU usage
60.47tf+0.47tf
miningCritBonusYield
Critical Success Bonus Yield
169.94%-30.06%
miningCritChance
Critical Success Chance
1.11%+0.11%
miningAmount
Mining amount
948.1m3-51.9m3
maxRange
Optimal Range
8919m-1081m
power
Powergrid Usage
10.76MW+0.76MW
effectiveMiningSpeed
Effective Mining Speed
4.22m³/s-0.03m³/s
35 million ISKest. 11 million ISK