Category

Meta Group

Meta Level

Miscellaneous

Availability

Trolellan Bedala
Modules owned by

Trolellan Bedala

Estimated value

ISK
1M
ISK
100B
1M
10M
100M
1B
10B
100B
1M
100B
Sort
Abyssal Strip MinerStrip Miner I Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
32.18GJ+9.18GJ
duration
Activation time / duration
45.63s+0.63s
cpu
CPU usage
76.98tf+16.98tf
miningCritBonusYield
Critical Success Bonus Yield
160.07%-39.93%
miningCritChance
Critical Success Chance
1.2%+0.2%
miningAmount
Mining amount
186.36m3+36.36m3
maxRange
Optimal Range
13238.25m-1761.75m
power
Powergrid Usage
10.81MW+0.81MW
effectiveMiningSpeed
Effective Mining Speed
4.16m³/s+0.76m³/s
140 million ISKest. 133 million ISK
Abyssal Strip MinerStrip Miner I Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.96GJ+3.96GJ
duration
Activation time / duration
42.78s-2.22s
cpu
CPU usage
69.84tf+9.84tf
miningCritBonusYield
Critical Success Bonus Yield
160.84%-39.16%
miningCritChance
Critical Success Chance
1.17%+0.17%
miningAmount
Mining amount
161.86m3+11.86m3
maxRange
Optimal Range
16422.75m+1422.75m
power
Powergrid Usage
12.18MW+2.18MW
effectiveMiningSpeed
Effective Mining Speed
3.85m³/s+0.46m³/s
118 million ISKest. 110 million ISK
Abyssal Gas Cloud HarvesterGas Cloud Harvester II Unstable Gas Cloud Harvester Mutaplasmid
capacitorNeed
Activation Cost
7.09GJ-2.91GJ
duration
Activation time / duration
81.14s+1.14s
cpu
CPU usage
68.32tf+2.32tf
miningAmount
Mining amount
127.66m3+27.66m3
maxRange
Optimal Range
1878.22m+378.23m
power
Powergrid Usage
12.2MW+2.2MW
miningWasteProbability
Residue Probability
40.55%+6.55%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.803x-0.197
miningSpeed
Mining Speed
1.57m³/s+0.32m³/s
178 million ISKest. 188 million ISK
Abyssal Gas Cloud HarvesterGas Cloud Harvester II Unstable Gas Cloud Harvester Mutaplasmid
capacitorNeed
Activation Cost
9.21GJ-0.79GJ
duration
Activation time / duration
82.37s+2.37s
cpu
CPU usage
54tf-12tf
miningAmount
Mining amount
127.17m3+27.16m3
maxRange
Optimal Range
1612.58m+112.58m
power
Powergrid Usage
14.14MW+4.14MW
miningWasteProbability
Residue Probability
26%-8%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.029x+0.029
miningSpeed
Mining Speed
1.54m³/s+0.29m³/s
303 million ISKest. 308 million ISK